N--MORA TAHOMA WOODS FIBER OPTIC INSTALL

SOL #: 140P8326Q0014Solicitation

Overview

Buyer

Interior
National Park Service
PWR OLYM MABO(83000)
PORT ANGELES, WA, 98362, United States

Place of Performance

Place of performance not available

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Miscellaneous (N099)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 18, 2026
2
Last Updated
Mar 17, 2026
3
Submission Deadline
Apr 2, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), Department of the Interior, is soliciting proposals for the N--MORA TAHOMA WOODS FIBER OPTIC INSTALL project. This Total Small Business Set-Aside opportunity involves the installation of an underground single-mode fiber optic network within the Tahoma Woods government housing area of Mount Rainier National Park. The project aims to establish a passive FTTx feeder/distribution network to support a future Active Optical Network. Proposals are due by April 2, 2026, at 3 PM PT.

Scope of Work

The project requires the engineering, furnishing, installation, and testing (EFI&T) of a fiber optic system, excluding active electronics. Key tasks include:

  • Outside Plant (OSP) Infrastructure: Procuring and installing a minimum 120-strand (144-fiber alternately acceptable) single-mode fiber optic feeder cable through existing and new conduit systems. This includes installing six subsurface vaults for mid-span access and splicing, ensuring minimum slack storage.
  • Inside Plant (ISP) & Terminal Equipment: Installing a 120-port LC high-density rackmount Optical Distribution Frame (ODF) in the Administration Building server room.
  • Building Entrances: Installing PVC building entrance conduit and 12-strand SMFO riser/lateral cable for apartment buildings (terminating in patch panels), and 6-fiber cable with fiber demarcation boxes (NIDs) for single-family homes/trailer pads.
  • Future Wireless Access Point (WAP) Preparation: Installing conduit and Ethernet cabling (Cat6A or standard Cat6) to predetermined WAP locations on apartment building verandas. Patch panels for Ethernet will be in existing wall-mount cabinets in storage rooms.
  • Testing & Deliverables: Performing end-to-end Tier 1 and Tier 2 testing on all installed fiber strands. Submitting As-Built drawings, OTDR trace reports, and a final fiber termination map.
  • Asphalt Work: Additional requirements for construction and asphalt application in Section 3.6 of the SOW.

Contract Details

  • Contract Type: Firm-Fixed-Price construction contract.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 238210, Electrical Contractors and Other Wiring Installation Contractors ($19 million size standard).
  • Estimated Value: Between $100,000 and $250,000.
  • Period of Performance: Anticipated award early to mid-April 2026, with work commencing within 10 days of Notice to Proceed and completion within 45 days.
  • Location: Tahoma Woods, Mount Rainier National Park, Ashford, WA.
  • Bonds & Insurance: Payment Bond and Liability Insurance are REQUIRED. Bid bonds and performance bonds are NOT REQUIRED.

Submission & Evaluation

  • Evaluation Factors: Price, Relevant Experience, Washington Contractor State License, Technical Approach, and Past Performance.
  • Submission Requirements: Quotations must be submitted electronically via email to michael_abner@nps.gov. Required documents include SF 1442, acknowledgement of amendments, completed price schedule (Attachment 5), active SAM registration, and Section K representations/certifications.
  • Site Visit: A site visit was required and held on March 4, 2026. Clarifications from this visit have been published.
  • SAM Registration: Offerors must have an active and current SAM.gov registration.

Key Dates & Contacts

  • Contractor Questions Deadline: March 23, 2026, at 12 PM PT.
  • Proposal Due Date: April 2, 2026, at 3 PM PT.
  • Primary Contact: Michael Abner, michael_abner@ios.doi.gov.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: Mar 17, 2026
Version 3
Solicitation
Posted: Mar 6, 2026
View
Version 2
Solicitation
Posted: Mar 6, 2026
View
Version 1
Solicitation
Posted: Feb 18, 2026
View
N--MORA TAHOMA WOODS FIBER OPTIC INSTALL | GovScope