N--MORA-TAHOMA WOODS HOUSING FIBER INSTALL

SOL #: 140P8326Q0014Award Notice

Overview

Buyer

Interior
National Park Service
PWR OLYM MABO(83000)
PORT ANGELES, WA, 98362, United States

Place of Performance

Place of performance not available

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Miscellaneous (N099)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 18, 2026
2
Last Updated
May 15, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

This is an Award Notice for the N--MORA-TAHOMA WOODS HOUSING FIBER INSTALL project at Mount Rainier National Park. The solicitation, which sought proposals for the installation of a fiber optic cable network, is now closed. This notice serves to document the conclusion of the procurement process.

Scope of Work

The awarded project involves the installation of an underground single-mode fiber optic (SMFO) passive FTTx feeder/distribution network to support a future Active Optical Network (AON) for the Tahoma Woods government housing area. Key tasks include:

  • Outside Plant (OSP) Infrastructure: Installation of a minimum 120-strand (144-strand acceptable) SMFO feeder cable in existing or new conduits, including subsurface vaults for mid-span access and splicing.
  • Inside Plant (ISP) & Terminal Equipment: Supply and installation of a 120-port LC high-density ODF in the Administration Building server room, and installation of building entrance conduit and fiber patch panels for apartment buildings and single-family homes/trailer pads.
  • Future Wireless Access Point (WAP) Preparation: Installation of conduit and Ethernet cabling (Cat6A or standard Cat6) to predetermined WAP locations on apartment buildings.
  • Testing and Acceptance: End-to-end Tier 1 and Tier 2 testing of all installed fiber strands, with submission of As-Built drawings, OTDR trace reports, and a final fiber termination map.

Contract Details

  • Type: Firm-Fixed-Price construction contract.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Estimated Value: Between $100,000 and $250,000.
  • Period of Performance: 45 calendar days after Notice to Proceed, with work anticipated to start within 10 days of award.

Solicitation Process & Requirements

The solicitation (RFQ No. 140P8326Q00014) was issued by the National Park Service (NPS).

  • Eligibility: Open only to small business concerns with a size standard of $19 million. Offerors were required to be actively registered in SAM.gov.
  • Site Visit: A mandatory site visit was held on March 4, 2026.
  • Questions Deadline: Contractor questions were due by March 23, 2026, 12 PM PT.
  • Quotation Due Date: The final deadline for electronic quotation submission was April 2, 2026, at 3 PM PT.
  • Bonds & Insurance: A Payment Bond and Liability Insurance were required; Bid bonds and Performance bonds were not.
  • Evaluation: Proposals were evaluated based on Price, Relevant Experience, Washington Contractor State License, Technical Approach, and Past Performance.

Contact Information

For inquiries related to the original solicitation, the primary contact was Marzjele Chisolm at Mickey_Chisolm@ios.doi.gov or 360-565-3025.

People

Points of Contact

Chisolm, MarzjelePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Award Notice
Posted: May 15, 2026
Version 4
Solicitation
Posted: Mar 17, 2026
View
Version 3
Solicitation
Posted: Mar 6, 2026
View
Version 2
Solicitation
Posted: Mar 6, 2026
View
Version 1
Solicitation
Posted: Feb 18, 2026
View
N--MORA-TAHOMA WOODS HOUSING FIBER INSTALL | GovScope