MQ-9 Load Testing

SOL #: W50SS7-26-Q-0011Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W7N2 USPFO ACTIVITY TXANG 147
HOUSTON, TX, 77034-5586, United States

Place of Performance

Houston, TX

NAICS

Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance (811310)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Maintenance And Repair Shop Equipment (J049)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 22, 2026
2
Last Updated
Jun 2, 2026
3
Submission Deadline
Jun 5, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The 147 Attack Wing Base Contracting Office intends to award a Firm-Fixed-Price Contract for MQ-9 Load Testing. This is a 100% Small Business Set-Aside opportunity. The requirement involves providing all necessary resources to perform annual load testing of specific equipment, including the TPE331-10 Engine Lift Fixture (J-Hook), for the MQ-9 aircraft. Quotes are due by June 5, 2026, at 7:00 PM UTC.

Opportunity Details

This is a combined synopsis/solicitation (W50S77-26-Q-0011) for commercial products, with quotes being requested and no separate written solicitation to be issued. The contract will be a Firm-Fixed-Price type.

Scope of Work

The selected contractor will be responsible for furnishing all labor, parts, tools, paint, test equipment, and appliances required for MQ-9 Load Testing. Key aspects include:

  • Performing load tests on specific equipment, such as the TPE331-10 Engine Lift Fixture (J-Hook), in accordance with the Performance Work Statement (PWS), associated specifications and drawings (1Q-9(M)A-2-4), and relevant international, federal, state, and local building codes.
  • Conducting annual load testing, which for the J-Hook involves applying 1,384 ±138 pounds for 30 seconds and Nondestructive Inspection (NDI) on welds.
  • Completing all work within fifteen (15) calendar days after receipt of equipment.
  • Providing a certificate or documentation of all equipment testing results.
  • Adhering to the U.S. Department of Labor's Service Contract Act wage determinations for Texas counties, as applicable.

Place and Period of Performance

While the solicitation indicates services are to be performed at the 147th Attack Wing, Texas Air National Guard, Houston, TX (14657 Sneider St, Houston, TX. 77034), the PWS specifies that the contractor shall perform all work at their own place of business. The period of performance shall begin within 30 days after the notice of award.

Eligibility & Evaluation

  • Set-Aside: 100% Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 8113101, with a small business size standard of $12.5M.
  • Evaluation Factors: Award will be based on the ability to meet technical capabilities and price. Past performance will not be evaluated. The Contracting Officer intends to make an award without discussions but may hold them if deemed in the government's best interest.

Key Dates & Contact

  • Quotes Due: June 5, 2026, at 7:00 PM UTC.
  • Questions Deadline: May 1, 2026, at 9:00 AM CST (now closed).
  • Contact: MSgt Buddy Ciemiengo at buddy.ciemiengo.1@us.af.mil.

People

Points of Contact

MSgt Buddy CiemiengoPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 8
Combined Synopsis/Solicitation
Posted: Jun 2, 2026
View
Version 7Viewing
Combined Synopsis/Solicitation
Posted: May 27, 2026
Version 6
Combined Synopsis/Solicitation
Posted: May 20, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: May 14, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: May 12, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: May 7, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 5, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
View