NASIC DISTRICT COOLING PLANT
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, W072 ENDIST LOUISVILLE, is soliciting proposals for the Design and Construction of a NASIC District Cooling Plant at Wright Patterson Air Force Base, OH. This is a Full and Open Procurement with a HUBZone 10% Price Evaluation Preference. The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00. Proposals are due by March 26, 2026, at 11:00 AM EDT.
Scope of Work
This solicitation covers the design and construction of a new District Cooling Plant (DCP) at Wright Patterson Air Force Base, Ohio. The project involves significant infrastructure development to support the National Air and Space Intelligence Center (NASIC).
Contract & Timeline
- Type: Solicitation (Request for Proposal)
- Magnitude: $25,000,000.00 - $100,000,000.00
- NAICS Code: 238220 (Commercial and Institutional Building Construction), Size Standard: $19,000,000
- Period of Performance: 817 Calendar Days from Issuance of Notice to Proceed (revised by Amendment 0001).
- Response Due: March 26, 2026, 11:00 AM EDT (latest update from Amendment 0005).
- Published Date: March 18, 2026 (latest publication).
Amendments & Key Changes
This opportunity has undergone several amendments:
- Amendment 0006: Removed clauses 252.204-7021 and 252.204-7025.
- Amendment 0005: Extended the proposal due date to March 26, 2026, 11:00 AM EDT, and included specification changes.
- Amendment 0004: Revised/replaced sections 01 35 43, 01 35 53, 08 71 00, 22 00 00, and numerous plan sheets. It also revised Clause FAR 52.236-27. A site visit was held on February 26, 2026.
- Amendment 0003: Removed requirements related to Paragraph 8.6 (Tab F - Project Labor Agreement) and clauses 52.222-33 and 52.222-34.
- Amendment 0001: Adjusted the Period of Performance to 817 Calendar Days.
Set-Aside & Preferences
This is a Full and Open Procurement. In accordance with FAR 19.1307, the project requires a HUBZone 10% Price Evaluation Preference.
Contact Information
- Primary: CHASE ROST (chase.j.rost@usace.army.mil)
- Secondary: Patrick Duggins (patrick.j.duggins@usace.army.mil)