New SABER (Simplified Acquisition of Base Engineering Requirements)

SOL #: FA441826R0004Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4418 628 CONS PK
JOINT BASE CHARLESTON, SC, 29404-5021, United States

Place of Performance

Charleston AFB, SC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

8(a) Set-Aside (FAR 19.8) (8A)

Timeline

1
Posted
Jan 21, 2026
2
Last Updated
May 6, 2026
3
Submission Deadline
May 20, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for a new Simplified Acquisition of Base Engineering Requirements (SABER) contract at Joint Base Charleston (JB CHS) and its outlying properties. This 8(a) Set-Aside opportunity requires comprehensive management, labor, material, equipment, and minor design services for a broad range of maintenance, repair, and minor construction work. Projects will be issued via Task Orders (TOs) valued between $2,000 and $2,000,000. Proposals are due May 20, 2026.

Scope of Work

The contractor will provide services for facilities including airfield support, R&D, waterfront, medical, academic, secure areas, infrastructure, and pavements across JB CHS, JB CHS-AB, JB CHS-NWS, Short Stay, North Auxiliary Airfield, Shaw Air Force Base, Defense Fuel Supply Point, Navy Consolidated Brig, and Nuclear Power Training Unit. The scope involves managing up to 50 concurrent projects and up to 75 projects annually. Key personnel required include a Senior Project Manager, Cost Estimator, Quality Control Manager, Project Manager, and Safety Manager. Limited design services are included, with 35% or greater design as a potential negotiated cost.

Contract Details

  • Contract Type: Indefinite Delivery Indefinite Quantity (IDIQ), Firm Fixed Price Task Orders.
  • Set-Aside: 8(a) Set-Aside (FAR 19.8).
  • Product Service Code: Z2JZ (Repair Or Alteration Of Miscellaneous Buildings).
  • Period of Performance: Base Year plus four 12-month Option Periods, plus a 6-month Extension of Services.
  • Estimated Magnitude: Minimum $2,000.00, Maximum Not-to-Exceed $74,000,000.00.
  • Pricing: Task Order pricing will be based on a Unit Price Book (UPB) utilizing RSMeans® and Custom Price Book line items, with offeror-provided coefficients.

Key Requirements & Deliverables

  • Quality Control: Implement a comprehensive QC program, including a QC Plan, documentation, and coordination meetings.
  • Health & Safety: Maintain a Health and Safety Plan compliant with EM 385-1-1.
  • Environmental: Adhere to federal, state, and local environmental regulations, including recycling and hazardous materials handling.
  • Sample Project: Proposals must address a single sample project (DKGV 1148855) for HVAC System replacement in Building 58 at JB Charleston Weapon Station, including a 35% design scope and detailed price proposal.

Submission & Evaluation

  • Proposal Due Date: May 20, 2026, by 7:00 PM UTC (3:00 PM EST).
  • Submission Method: Electronically via DOD SAFE (https://safe.apps.mil). File compression utilities are prohibited; individual PDF files (text-searchable) are required.
  • Evaluation Factors: (1) Past Performance, (2) Technical Capability (pass/fail), and (3) Price. Past Performance is significantly more important than price. Technical proposals from up to seven of the lowest priced offerors will be evaluated on a pass/fail basis.
  • Proposal Format: Page limitations for the Technical Proposal (Section L, Part II), Key Personnel resumes, and Subfactor 3 (Sample Project) have been removed. Font size must be not less than 10-point for Parts II and III.
  • Past Performance: Projects must have been performed within the last 5 years; ongoing contracts are acceptable.
  • Bonds: A proposal bond of $2,960,000.00 is required. Performance and Payment Bonds of $4,884,000.00 (or 100% of total active task orders) are required within 15 days of award.

Contact Information

People

Points of Contact

Lisa B. Mitchell, Contracting SpecialistPRIMARY
Brandy M. Stroud, Contracting OfficerSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: May 6, 2026
Version 3
Solicitation
Posted: Apr 24, 2026
View
Version 2
Solicitation
Posted: Apr 8, 2026
View
Version 1
Pre-Solicitation
Posted: Jan 21, 2026
View
New SABER (Simplified Acquisition of Base Engineering Requirements) | GovScope