Nez Perce-Clearwater NF Salmon River Seed Orchard Well Drilling (2026)

SOL #: 1240LU26Q0065Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 9
Ogden, UT, 844012310, United States

Place of Performance

Nezperce, ID

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Water Purification And Sewage Treatment Equipment (J046)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 27, 2026
2
Last Updated
May 6, 2026
3
Submission Deadline
May 15, 2026, 6:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is seeking quotations for Salmon River Seed Orchard Well Drilling within the Nez Perce-Clearwater National Forests, Idaho. This Total Small Business Set-Aside opportunity aims to provide a potable water supply to the nursery. The project involves drilling a well according to strict specifications, with options for additional wells if initial attempts do not meet requirements. Quotations are due May 15, 2026, at 06:00 AM UTC.

Scope of Work

The primary objective is to drill and complete a well to supply potable water to the nursery at the Salmon River Seed Orchard. Key aspects include:

  • Drilling and construction of a well in accordance with detailed plans and specifications (Attachments 3 & 4).
  • Minimum production requirement of 10 GPM for 24 hours (or 5 GPM for 72 hours).
  • Provisions for decommissioning a well and drilling a replacement if the initial well does not meet specifications.
  • Crucially, only the specified 10-inch well with steel casing is permitted; alternative drilling methods or well construction (e.g., 8-inch well with 4-inch PVC liner) will not be accepted.
  • Work includes mobilization, sediment control, permits, casing, grouting, yield and drawdown testing, chemical analysis, and bacteriological tests.
  • Prevailing wage rates (GDN ID20260051) apply for labor.

Contract Details

  • Contract Type: Request for Quotation (RFQ), anticipated Firm Fixed Price.
  • Set-Aside: Total Small Business Set-Aside.
  • NAICS Code: 237110 Water and Sewer Line and Related Structures Construction (Size Standard: $45M).
  • Magnitude: Estimated between $100,000 and $250,000.
  • Period of Performance: Work shall commence no earlier than June 01, 2026, and conclude no later than May 31, 2027.
  • Place of Performance: Salmon River Seed Orchard, Nez Perce-Clearwater National Forests, Idaho County, Idaho.

Submission & Evaluation

  • Quotations Due: May 15, 2026, at 06:00 AM UTC.
  • Evaluation Criteria: Best value determination based on:
    • Experience: Assessed for similarity in scope, size, and complexity.
    • Past Performance: Evaluated based on recency, relevancy, and quality of up to three contracts within the last five years.
    • Price: Assessed for fairness and reasonableness.
  • Required Documents: Schedule of Items (Attachment 1), Experience Questionnaire (Attachment 6), and Bid Guarantee (if quote exceeds $150,000).
  • Bonds: A 20% Bid Bond is required for quotes over $150,000. Performance and Payment Bonds (100%) are required for contracts over $150,000. Payment protections are required for contracts between $35,000 and $150,000.

Important Notes

Contractors are highly encouraged to visit the Salmon River Seed Orchard to familiarize themselves with the site layout, though no official site visit will be performed.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 6, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
View