Nez Perce-Clearwater NF Salmon River Seed Orchard Well Drilling (2026)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is seeking quotations for Salmon River Seed Orchard Well Drilling within the Nez Perce-Clearwater National Forests, Idaho. This Total Small Business Set-Aside opportunity aims to provide a potable water supply to the nursery. The project involves drilling a well according to strict specifications, with options for additional wells if initial attempts do not meet requirements. Quotations are due May 15, 2026, at 06:00 AM UTC.
Scope of Work
The primary objective is to drill and complete a well to supply potable water to the nursery at the Salmon River Seed Orchard. Key aspects include:
- Drilling and construction of a well in accordance with detailed plans and specifications (Attachments 3 & 4).
- Minimum production requirement of 10 GPM for 24 hours (or 5 GPM for 72 hours).
- Provisions for decommissioning a well and drilling a replacement if the initial well does not meet specifications.
- Crucially, only the specified 10-inch well with steel casing is permitted; alternative drilling methods or well construction (e.g., 8-inch well with 4-inch PVC liner) will not be accepted.
- Work includes mobilization, sediment control, permits, casing, grouting, yield and drawdown testing, chemical analysis, and bacteriological tests.
- Prevailing wage rates (GDN ID20260051) apply for labor.
Contract Details
- Contract Type: Request for Quotation (RFQ), anticipated Firm Fixed Price.
- Set-Aside: Total Small Business Set-Aside.
- NAICS Code: 237110 Water and Sewer Line and Related Structures Construction (Size Standard: $45M).
- Magnitude: Estimated between $100,000 and $250,000.
- Period of Performance: Work shall commence no earlier than June 01, 2026, and conclude no later than May 31, 2027.
- Place of Performance: Salmon River Seed Orchard, Nez Perce-Clearwater National Forests, Idaho County, Idaho.
Submission & Evaluation
- Quotations Due: May 15, 2026, at 06:00 AM UTC.
- Evaluation Criteria: Best value determination based on:
- Experience: Assessed for similarity in scope, size, and complexity.
- Past Performance: Evaluated based on recency, relevancy, and quality of up to three contracts within the last five years.
- Price: Assessed for fairness and reasonableness.
- Required Documents: Schedule of Items (Attachment 1), Experience Questionnaire (Attachment 6), and Bid Guarantee (if quote exceeds $150,000).
- Bonds: A 20% Bid Bond is required for quotes over $150,000. Performance and Payment Bonds (100%) are required for contracts over $150,000. Payment protections are required for contracts between $35,000 and $150,000.
Important Notes
Contractors are highly encouraged to visit the Salmon River Seed Orchard to familiarize themselves with the site layout, though no official site visit will be performed.