NIST Boulder B1 Wing 6 Seal Above Hallway Doors

SOL #: 1333ND26RNB190030Combined Synopsis/Solicitation

Overview

Buyer

Commerce
National Institute Of Standards And Technology
DEPT OF COMMERCE NIST
GAITHERSBURG, MD, 20899, United States

Place of Performance

Boulder, CO

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Office Buildings (Z2AA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 12, 2026
2
Submission Deadline
Jul 15, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Institute of Standards and Technology (NIST), under the Department of Commerce, is soliciting proposals for construction services to "Seal Above Hallway Doors" for Building 1, Wing 6 at its Boulder, CO campus. This project primarily involves extending a demising wall and sealing penetrations to thermally and mechanically isolate Wing 6 from the Spine corridor. An optional scope includes reconstructing Storage Room #4089 and installing security hardware. This is a Total Small Business Set-Aside. Proposals are due July 15, 2026.

Scope of Work

The core project requires extending the Building 1 Wing 6 demising wall vertically to the structural concrete deck above, eliminating a 2-3.5 ft gap. This includes sealing all penetrations and abandoned penetrations with fire-rated materials where the wall separates the Women’s restroom from the Spine corridor. The optional scope may involve reconstructing Storage Room #4089, installing hollow metal door frames and doors with security hardware, sealing wall penetrations, providing additional fire sprinkler protection, installing interior lighting, and NIST-standard interior signage. The contractor is responsible for all labor, materials, site protection, debris removal, and coordination in accordance with NIST campus safety and construction requirements.

Key Requirements & Contractor Responsibilities

Contractors must adhere to NIST Boulder General Contractor Requirements, including specific hours of operation (7:00 AM - 5:00 PM, M-F), identification procedures, and security protocols. A site-specific Safety, Health, and Environmental Plan is mandatory and must be submitted within 7 days of award, following the NIST Safety Plan Requirements Checklist. Performance and Payment Bonds are required. Compliance with the Davis-Bacon Act wage determination for Boulder County, CO, is essential for labor costs. If the optional scope is exercised, contractors must also adhere to Boulder Laboratories Physical Access Control Standards for security hardware installation.

Contract Details

  • Opportunity Type: Combined Synopsis/Solicitation (Negotiated RFP)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 236220 (Repair Or Alteration Of Office Buildings)
  • Small Business Size Standard: $45.0 Million
  • Period of Performance: 183 days from the issuance of the Notice to Proceed
  • Place of Performance: NIST Boulder Campus, Boulder, CO

Submission & Evaluation

Offers are due by 5:00 PM MT on July 15, 2026. Proposals will be evaluated based on the lowest price and technical acceptability, with technical acceptability being a pass/fail assessment. The Government reserves the right to make no award.

Important Dates

  • List of Individuals for Site Visit Due: June 30, 2026
  • Site Visit: July 2, 2026 @ 1:00 PM (in front of Building 1)
  • Questions Due: July 6, 2026
  • Proposals Due: July 15, 2026

Contact Information

People

Points of Contact

Lauren LopezPRIMARY
Travis ZoellnerSECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Jun 12, 2026
NIST Boulder B1 Wing 6 Seal Above Hallway Doors | GovScope