NPS - REPAIR EQUIPMENT STORAGE SHED AT CARL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), specifically the DOI, NPS CONOPS STRATEGIC office, has issued a Solicitation for commercial construction services to repair the maintenance equipment storage shed at the Carl Sandburg Home National Historic Site (CARL) in Flat Rock, NC. This project, estimated under $350,000, addresses damage sustained from Hurricane Helene. The opportunity is a Total Small Business Set-Aside. Quotes are due June 23, 2026, by 5 PM ET.
Scope of Work
The project involves comprehensive repairs and restoration of the storage shed. Key tasks include:
- Roof Replacement: Removal and disposal of approximately 4500 sq ft of existing asphalt shingle roofing and underlayment, repair of damaged plywood, and installation of new roofing components, including 30-year architectural asphalt shingles.
- Gutters and Downspouts: Replacement of approximately 150 linear feet of gutters with new galvanized steel gutters, hangers, and guards, along with four new downspouts.
- Structural Repairs: Replacement of damaged roof trusses, fascia boards, header beams, and wall framing. This includes installing new T1-11 siding on the east wall and repairing cedar tongue-and-groove siding on the front.
- Garage Doors: Removal of three damaged sectional garage doors and installation of three new "Overhead Door" Sectional Steel Doors (Model 432 or equivalent) with associated hardware, operators, and photo eyes.
- Electrical Repairs: Removal of damaged wiring, conduit, boxes, and light fixtures, followed by the installation of new components, including an LED overhead light fixture, with full safety testing.
- Window Installation: Installation of one new window in the east wall to match existing windows. All work must comply with the International Building Code, National Electric Code, and National Fire Protection Association codes.
Contract Details
- Contract Type: Firm-fixed price commercial contract.
- Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5).
- NAICS Code: 237990 (Small Business Size Standard: $45M).
- Product/Service Code: Z1GZ (Maintenance Of Other Warehouse Buildings).
- Period of Performance: Not more than 180 days after Notice to Proceed, estimated from July 8, 2026, to January 7, 2027.
- Place of Performance: Carl Sandburg Home National Historic Site, 81 Carl Sandburg Lane, Flat Rock NC 28731-8635.
- Mandatory Compliance: Offerors must be registered and active in SAM.gov as a small business under the specified NAICS code. Compliance with FAR Clause 52.219-14 (Limitations on Subcontracting) and prevailing wage rates (Davis-Bacon Act, GDN NC20260079) is required.
Submission & Evaluation
- Quotes Due: June 23, 2026, by 5 PM ET.
- Questions Due: June 9, 2026, by 5 PM ET (submit in writing using the attached Q&A Document).
- Submission Method: Quotes (inclusive of Price and Technical information) must be submitted via email to Cole_Johnson@NPS.Gov.
- Evaluation Criteria: Best Value Trade-Off, with technical capability considered more important than price. Evaluation will include Strengths, Weaknesses, Opportunities, and Threats (SWOT) for both price and technical aspects.
- Required Submittals: Draft schedule, documentation of prior relevant experience (up to three projects), Key Personnel list, and a completed Limitations on Subcontracting Worksheet.
Additional Notes
A site visit is scheduled for June 1, 2026, at 10:00 AM ET at the Carl Sandburg Home (NPS) Headquarters Building. Attachments include the Statement of Work, Q&A Document, Limitations on Subcontracting Worksheet, and Construction Wage Determination.