OTF FR 2130 Perch Lake Road Rehabilitation

SOL #: 12445526Q0056Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 13
Atlanta, GA, 303092449, United States

Place of Performance

Place of performance not available

NAICS

Highway (237310)

PSC

Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways (Z2LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 13, 2026
2
Last Updated
May 11, 2026
3
Submission Deadline
May 18, 2026, 12:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting quotes (RFQ) for OTF FR 2130 Perch Lake Road Rehabilitation on the Ottawa National Forest. This project involves comprehensive road reconditioning and associated infrastructure work. This acquisition is a Total Small Business Set-Aside. Quotes are due May 18, 2026, at 8:00 AM Eastern Time.

Scope of Work

The project encompasses rehabilitation of FR 2130, specifically from Station 0+00 to Station 169+66. An optional bid item extends the work to Station 382+92. Key tasks include:

  • Mobilization
  • Drainage excavation and riprap placement
  • Aggregate surface replacement and roadway reconditioning
  • Culvert replacement/new installation
  • Temporary traffic controls
  • Turf establishment and geosynthetic material placement

The work will be performed on the Ottawa National Forest within the Kenton and Iron River Ranger Districts. Contractors are strongly encouraged to inspect the site prior to bidding.

Contract Details

  • Contract Type: Request for Quotes (RFQ) for construction services, anticipated Firm Fixed Price (FFP).
  • Estimated Magnitude: Between $500,000.00 and $1,000,000.00.
  • Period of Performance: 90 days after Notice to Proceed (NTP).
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS: 237310 - Highway, Street, and Bridge Construction (Size Standard: $45,000,000.00).

Submission & Evaluation

  • Quote Submission: Quotes must include a priced Schedule of Items and acknowledgement of amendments. Quotes with a base item subtotal exceeding $150,000.00 require a bid bond on Standard Form 24 (SF-24).
  • Submission Deadline: May 18, 2026, at 8:00 AM Eastern Time.
  • Evaluation Criteria: Award will be made to the lowest priced, responsible bidder who is responsive to the solicitation. Responsibility will be determined per FAR subpart 9.104-1. Quotes will be evaluated for price alone, representing the best value to the Government.
  • Questions Due: May 13, 2026, at 8:00 AM Eastern Time, via email to Kevin.Brown2@usda.gov.

Key Documents & Clarifications

  • Plans: Detailed plans (Attachment 2) provide an Index of Sheets, Quantities, and General Notes, including project location, travel directions, and material sources (Bush Creek Pit, Six Mile Pit).
  • Supplemental Specifications: Attachment 3 details numerous revisions and additions to construction specifications (e.g., Sections 101, 104, 156, 204), impacting terms, control of work, public traffic, and excavation.
  • Wage Determination: Attachment 4 provides Michigan prevailing wage rates (MI20260001) for various construction trades, essential for labor cost estimation.
  • Vendor Q&A (May 11, 2026): Clarified exact coordinates for material pits and confirmed that waste material disposal methods will be directed by the COR in the field.

People

Points of Contact

Kevin BrownPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 11, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 13, 2026
View
OTF FR 2130 Perch Lake Road Rehabilitation | GovScope