Phillips Parkway Haul Route
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, specifically W074 ENDIST MOBILE, is soliciting for the Phillips Parkway Haul Route project, involving construction of highways, roads, streets, bridges, and railways. This is a Solicitation designated as a Total Small Business Set-Aside. The project is located at Cape Canaveral SFS, FL. Responses are due June 3, 2026.
Scope of Work
This opportunity, titled "AM03 to Phillips Parkway Haul Route," involves the Construction Of Highways, Roads, Streets, Bridges, And Railways. The specific work is for the Phillips Parkway Haul Route at Cape Canaveral SFS, FL.
Contract & Timeline
- Type: Solicitation
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Response Due: June 3, 2026, 7:00 PM ET
- Published: May 14, 2026
Evaluation
Evaluation factors are not explicitly provided in the available metadata.
Additional Notes
Associated documents include links to the PIEE Solicitation Module, web-based training, registration instructions, and the Department of Defense Procurement Toolbox. Several CADD files (MEF26011_CADD_Files_For_Information_Only_*.zip) are also provided for informational purposes.