F--PINTO MESA CUT AND PILE PHASE 2 BLM
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This is an Award Notice for the Pinto Mesa Cut and Pile Phase 2 BLM project, issued by the Department of the Interior, Bureau of Land Management. The notice confirms an award has been made for fuels management services involving the cutting and piling of pinyon and juniper trees on approximately 432 acres near Meeker, CO. Details regarding the awardee and contract value are not provided in this notice. The original solicitation was a Total Small Business Set-Aside.
Original Solicitation Details
The solicitation (RFQ 140L3726Q0024) sought proposals for "Cut and Pile" services to reduce wildland fire risk.
- Quotes were due: Tuesday, March 24, 2026, at 9:00 a.m. Mountain Time.
- Contract Type: Firm-fixed price.
- Period of Performance: July 16, 2026, to November 30, 2026. Work was prohibited between December 15 and July 15 due to wildlife timing, with an exception for drought conditions.
- Set-Aside: Total Small Business (NAICS 115310, $34.0 million size standard).
- Evaluation Factors: Award was to be made to the responsible vendor whose quote conformed to the solicitation and technical evaluation factors, including Project Experience, Technical Capability, and Price.
Scope of Work (from original SOW)
The project involved:
- Cutting and hand-piling pinyon and juniper trees (12 inches DBH or less) using contractor-furnished crews and chainsaws.
- Incorporating existing standing dead and dead/down material into piles.
- Ensuring stumps were cut to 4 inches or less.
- Constructing piles 10x10 feet (not exceeding 12x12 feet), spaced at least 10 feet apart, and 50 feet from sensitive areas (private land, survey monuments, power lines, drainages).
- An Acceptable Quality Level (AQL) of 85% Work Quality Level was required, with government inspections evaluating compliance.
Special Requirements
Contractors were required to provide all equipment, fuel, and personnel, including a GPS capable of accepting GPX files and an English-speaking representative on-site. Strict fire prevention measures, protection of survey monuments, and cleaning equipment of noxious weeds were mandatory.
Contact Information
For the original solicitation, the primary contact was Daniel Rosales (drosales@blm.gov). The COR for the project is Shane Pfeiffer (970-620-6957).