Pistol Range Repairs SAS189A (230060)

SOL #: N4008526R9034Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 28, 2026
2
Last Updated
May 27, 2026
3
Submission Deadline
May 28, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for Pistol Range Repairs SAS189A (Project 230060) at Camp Lejeune, NC. This opportunity is a Total Small Business Set-Aside but is restricted to pre-qualified General MACC Contractors listed on the General Requirements cover page. The estimated project value is between $1,000,000 and $5,000,000. Proposals are due May 28, 2026, at 2:00 PM EST.

Scope of Work

The project involves repair and alteration of the Pistol Range SAS189A. Key components include:

  • Base Requirement (ELIN 0001): Replacement of acoustical panels and roof replacement over the bullet trap.
  • Optional Work (ELINs 0002 & 0003): Removal of rust, priming, and painting of exposed steel structure; installation of an epoxy coating on exposed concrete slab. The Government reserves the right to award these options at contract award.
  • Environmental & Safety: Strict adherence to Federal, State, and local environmental regulations, including comprehensive safety protocols. A lead paint survey identified lead-based paint in a "Red Exterior Wood" sample, requiring compliance with lead-safe practices for any disturbing work. An asbestos survey found no asbestos-containing materials.
  • Specifications: Detailed requirements for environmental management, safety, construction materials (structural steel, metal roofing, coatings), and closeout submittals are provided.

Contract & Timeline

  • Contract Type: Combined Synopsis/Solicitation (RFP).
  • Product Service Code: Z2JZ - Repair Or Alteration Of Miscellaneous Buildings.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5), limited to specific MACC Contractors.
  • Estimated Value: $1,000,000 - $5,000,000.
  • Period of Performance: 360 days after award.
  • Proposal Due: May 28, 2026, 2:00 PM EST.
  • Requests for Information (RFIs) Due: May 13, 2026, 2:00 PM EST.
  • Site Visit: Scheduled for May 6, 2026, at 9:00 AM EST at the Pistol Range SAS189A.
  • Published Date: May 4, 2026.

Submission & Evaluation

  • Submission Method: Proposals must be submitted via email to tony.d.benson.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil.
  • Pricing: Bidders must provide prices for all Exhibit Line Item Numbers (ELINs 0001-0003) on the provided pricing sheet; failure to do so may result in rejection. Evaluation will consider the total price for ELINs 0001 through 0003.
  • Basis for Award: Lowest Price.
  • Proposal Acceptance Period: 60 days from receipt of offers.
  • Amendment Acknowledgment: Offerors must acknowledge Amendment 0001 when submitting their proposal.

Key Considerations

  • Funding: Award is contingent on funding availability; no award will be made if funds are not available.
  • Bonds: Bid bonds are required for proposals valued at $40,000 and greater. Payment and performance bonds are also required based on proposal value.
  • Executive Orders: Executive Order 13706 (Paid Sick Leave) and Executive Order 13658 (Minimum Wage) apply.
  • Buy American: A "Notice of Buy American Requirement-Construction Materials" is included.

People

Points of Contact

Lauren LocontoSECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: May 27, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: May 13, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: May 4, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 4, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View