Playground and Flood Prevention - Havasupai Elemen

SOL #: 140A2326R0023Solicitation

Overview

Buyer

Interior
Bureau Of Indian Affairs
INDIAN EDUCATION ACQUISITION OFFICE
Albuquerque, NM, 87104, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Architect And Engineering Construction: Schools (C1CA)

Set Aside

No set aside specified

Timeline

1
Posted
May 28, 2026
2
Submission Deadline
Jun 11, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, Bureau of Indian Affairs (BIA), through its Indian Education Acquisition Office, is soliciting proposals for the Playground and Flood Prevention Phase I project at Havasupai Elementary School in Supai, AZ. This is a Solicitation for a single firm fixed-price contract with an estimated value between $250,000 and $500,000. The opportunity is set aside for Indian Economic Enterprises. Proposals are due by June 11, 2026, at 5 PM MDT.

Scope of Work

The project's objective is to reduce safety risks, stabilize site conditions, and improve the functionality of existing outdoor recreation areas at Havasupai Elementary School. Phase I work includes:

  • Demolition and removal of existing playground equipment and approximately half of the existing basketball court.
  • Demolition and removal of designated stair sections.
  • Salvage, handling, transport, and relocation of saw-cut concrete for flood control, drainage, and erosion mitigation.
  • Preparation and resurfacing of the remaining basketball court slab, including new striping and one adjustable basketball hoop system.
  • Installation of temporary wood chip/mulch ground cover in former playground and concrete removal areas.
  • Installation, maintenance, and removal of temporary construction fencing and site protection measures.

The place of performance is Havasupai Elementary School, 40 Main Street, Supai, AZ 86435. The period of performance is sixty (60) calendar days from the notice to proceed, with work to be completed no later than August 2026.

Contract Details

  • Contract Type: Single Firm Fixed-Price.
  • Estimated Price Range: $250,000 to $500,000.
  • Period of Performance: 60 calendar days from notice to proceed.
  • Funding: Contingent upon appropriation of funds.
  • Set-Aside: This is an Indian Economic Enterprise Set-Aside (DIAR 1452.280-2). Offerors must meet the definition of an Indian Economic Enterprise as defined in DIAR 1480.201.
  • Bonding Requirements: Bid Bond (20%), Performance Bond (100%), and Payment Bond (100%) are required.

Submission & Evaluation

  • Proposal Deadline: June 11, 2026, at 5 PM MDT.
  • Submission Method: Proposals must be submitted via email to Yui Hoptowit (yui.hoptowit@bie.edu).
  • Evaluation Process: Lowest Price Technically Acceptable (LPTA) source selection. Proposals will undergo Preliminary Screening, and only the lowest priced responsive offer will be reviewed for technical acceptability.
  • Required Submissions: Description of required work/costs, qualifications of key personnel, written assurance of compliance, and the Indian Affairs Indian Economic Enterprise Representation Form (Attachment 9).

Key Requirements & Notes

  • No Site Visit: Offerors must rely on provided information, including drawings (Attachment 10) and specifications.
  • Questions: All questions must be submitted via the attached Questions and Answers Log (Attachment 2) by June 3, 2026, at 5 PM MDT.
  • Compliance: Adherence to Davis Bacon Wage Determinations (AZ20260012), safety program requirements (including a written plan and pre-construction meeting), and background investigations for personnel with regular contact with Indian children. The site must be fully enclosed with a minimum 6-foot fence.
  • Other: Offerors are responsible for contacting the tribe regarding Tribal Taxes and TERO Fee Requirements. Real ID Act of 2005 compliance is required for facility access. Material approval submittals must use IA Form 3000 (Attachment 8).

People

Points of Contact

Hoptowit, YuiPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: May 28, 2026
Playground and Flood Prevention - Havasupai Elemen | GovScope