POL INBOUND GATE REPLACEMENT
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, 22d Civil Engineer Squadron (CES) at McConnell Air Force Base, Kansas, is soliciting proposals for the replacement of an inbound vehicle gate at the Petroleum, Oils, and Lubricants (POL) area. This Total Small Business Set-Aside opportunity (Solicitation FA462126Q0019) aims to enhance flightline security and ensure unimpeded access for POL and emergency services personnel, addressing recent damage to the existing gate. Quotes are due May 7, 2026, at 1:00 PM CST.
Scope of Work
The contractor shall provide all personnel, equipment, tools, materials, and supervision for the project. Key deliverables include:
- Removal and proper disposal of the existing gate.
- Fabrication and installation of a new powder-coated aluminum vehicle gate system, adhering to detailed specifications provided in Attachment 1.
- Installation of new heavy-duty gate hardware (rollers, guides, stops) and an additional set of UL325 Thru Beam Photoeyes (or approved equal), approximately 24 inches above existing ones.
- Integration of the new gate, rail, and safety systems with the existing government-owned gate operator to ensure full functionality.
- Utilization of existing gate posts and replacement of the existing gate operator rail. A minimum one-year warranty on all materials, equipment, and workmanship is required, commencing upon final inspection and acceptance.
Contract Details
- Type: Firm Fixed Price
- Set-Aside: Total Small Business (NAICS: 332323, Fabricated Metal Product Manufacturing; Size Standard: 500 Employees)
- Period of Performance: Full installation and operational gate required no later than 90 calendar days from the date of contract award.
- Funding: Award is contingent upon funding availability.
Key Dates & Submission
- Visitor Pass Request Forms Due: April 27, 2026, 1:00 PM CST
- Site Visit: April 29, 2026, 8:00 AM CST at McConnell Air Force Base, Kansas. Base access requires a "MAFB Short Term Pass Request" form.
- Questions Due: May 1, 2026, 1:00 PM CST
- Quotes Due: May 7, 2026, 1:00 PM CST
- Submission: Offers must be submitted in PDF format.
Evaluation Factors
Award will be made to the technically acceptable offeror who submits the lowest-priced bid and can meet the lead time requirements.
- Technical Acceptance: Evaluated on an "Acceptable" or "Unacceptable" basis, requiring demonstration of a complete understanding and capability to meet all Statement of Need (SON) requirements.
- Price: Total firm-fixed-price for all parts, materials, equipment, labor, and services, evaluated for fairness and reasonableness.
- Lead Time: Total project completion time (material delivery and removal/installation) must be no later than 90 calendar days from the date of contract award. A lead time exceeding 90 days is unacceptable.
Additional Notes
Solicitation Amendment 0001 (dated April 23, 2026) adds Clause 52.232-18 and updates Sections L (Instructions to Offerors/Contractors) and M (Evaluation Factors for Award). Bidders must review these changes to ensure compliant proposals.