Potable Water Testing Services, Buffumville Lake, Charlton, MA

SOL #: W912WJ26QA072Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SD ENDIST NEW ENGLAND
CONCORD, MA, 01742-2751, United States

Place of Performance

Charlton, MA

NAICS

Testing Laboratories and Services (541380)

PSC

Water Quality Support Services (F103)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 16, 2026
2
Last Updated
Mar 30, 2026
3
Submission Deadline
Apr 3, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers - New England District is soliciting proposals for Potable Water Testing Services at Buffumville Lake Park, Charlton, MA. This Total Small Business Set-Aside opportunity requires a contractor to provide comprehensive water sampling, testing, and regulatory compliance services, including acting as the primary communicator with the Massachusetts Department of Environmental Protection (Mass DEP) and serving as the operator of record. Proposals are due by April 3, 2026, at 6:00 PM ET.

Scope of Work

The contractor will provide all labor, materials, equipment, and transportation necessary to sample and test potable water at Buffumville Lake Park, adhering to 310 CMR 22.00: The Massachusetts Drinking Water Regulations. Key responsibilities include:

  • Sampling and testing potable water at designated points, including required April coliform sampling.
  • Acting as the primary communicator between the Government and Mass DEP.
  • Completing and submitting all required documents and forms to ensure the public water supply operates in accordance with Mass DEP.
  • Acting as the operator of record, assuming overall regulatory responsibility, completing Annual Statistical Reports, cross-connection surveys, and participating in sanitary surveys.
  • Verifying correct PWS reopening, identifying compliance issues, and submitting certification to MA DEP (physical reopening performed by project staff).
  • Preparing and submitting safety-related documents, including an Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA), and complying with USACE Safety and Occupational Health Requirements (EM 385-1-1) and OSHA standards.
  • The bid schedule for Routine Water Testing (Task Item #2) has been revised to include 6 events annually, with costs encompassing all associated activities per event.

Contract & Timeline

  • Opportunity Type: Solicitation (Request for Quotations - RFQ)
  • Contract Type: Implied Firm Fixed-Price
  • Period of Performance: Base Year (April 1, 2026, or contract award to March 31, 2027) with two (2) option years.
  • Response Due Date: April 3, 2026, 6:00 PM ET
  • Published Date: March 30, 2026

Eligibility & Submission

  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 541380 (Testing Laboratories) with a $19 Million size standard.
  • Product/Service Code: F103 (Water Quality Support Services).
  • Evaluation Factors: Technical, Price, and Past Performance will be comparatively evaluated.
  • Submission Method: Quotes must be submitted via email to the Contract Specialist.
  • Mandatory Requirement: All vendors must have an active registration in SAM.gov at the time of submission; non-compliant vendors will be rejected.
  • Required Personnel: A Massachusetts (MA) certified operator is required to perform the services.
  • Required Submittals: Bidders must complete and submit a "Solicitation Survey" detailing company information, experience, key personnel, certifications/licenses, and references.

Contact Information

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Solicitation
Posted: Mar 30, 2026
Version 4
Solicitation
Posted: Mar 27, 2026
View
Version 3
Solicitation
Posted: Mar 26, 2026
View
Version 2
Solicitation
Posted: Mar 19, 2026
View
Version 1
Solicitation
Posted: Mar 16, 2026
View
Potable Water Testing Services, Buffumville Lake, Charlton, MA | GovScope