POWER DIST UNIT
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy (NAVSUP WEAPON SYSTEMS SUPPORT MECH) has issued a Solicitation for the repair of a POWER DIST UNIT. This opportunity requires a Repair Turnaround Time (RTAT) of 70 Days and Government Source Inspection (GSI). The solicitation close date was extended to May 1, 2026, as per an amendment published on May 7, 2026.
Scope of Work
This Request for Quote (RFQ) is for the repair of a POWER DIST UNIT, requiring adherence to specific operational and functional requirements, including CAGE Code/Reference Number items (e.g., 1Z292 AD813-108D-1). All repair work must follow the contractor's standard practices, manuals, and directives. Marking must comply with MIL-STD-130, REV N. The Government encourages accelerated delivery and requires all freight to be FOB Origin.
Contract & Timeline
- Type: Solicitation (RFQ for repair)
- Set-Aside: None specified
- Response Due: May 1, 2026 (as extended by amendment)
- Amendment Published: May 7, 2026
Key Requirements & Evaluation
Offerors must provide Unit Price, Total Price, and proposed Repair Turnaround Time (RTAT). If the Government's required 70-day RTAT is not met, offerors must provide capacity constraints. The resultant award will be bilateral, requiring contractor written acceptance. An option for increased quantity may be added. A price reduction will be incurred for failure to meet RTAT, unless excusable. Consideration for award will only be given to authorized distributors of the original manufacturer, with proof required.
Quality & Packaging
The contractor is responsible for all inspection requirements, including testing repaired items per original manufacturer's specifications. Records of inspection must be kept for 365 days. Packaging must comply with MIL-STD 2073.
Contact Information
For inquiries, contact VALENTINO.P.ARENA.CIV@US.NAVY.MIL or 717-605-2498.