USS HIGGINS (DDG 76) 6C1 BUNDLE 3

SOL #: N6264926RA044Pre-Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP FLT LOG CTR YOKOSUKA
FPO, AP, 96349-1500, United States

Place of Performance

Yokosuka, JP-14, Japan

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (West) Ship Repair (Including Overhauls And Conversions) Performed On. Non Nuclear Propelled And Nonpropelled Ships West Of The 108th Meridian (J999)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 20, 2026
2
Last Updated
May 12, 2026
3
Response Deadline
May 18, 2026, 1:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVSUP Fleet Logistics Center Yokosuka, is soliciting proposals for repair and maintenance services for the USS HIGGINS (DDG 76) during its FY26 6C1 availability. This requirement covers a bundle of work items, including inspection, repair, and preservation of various ship spaces and components, as well as scaffolding services. The work is to be performed at Yokosuka Naval Base, Japan. Proposals are due May 18, 2026, at 10:00 AM Japan Standard Time (JST).

Scope of Work

The scope includes a package of work items (Technical Group Instructions - TGIs) for the USS HIGGINS (DDG 76). Key tasks involve:

  • Inspection, repair, and preservation of forward and aft uptake spaces.
  • Inspection, repair, and preservation of intake spaces for No. One GTM and SSGTG, and No. 2 & No. 3 GTM and SSGTG.
  • Repair of structural members in the main deck weather.
  • Repair of intake and uptake louvers.
  • Installation and removal of scaffolding for ship's force work.
  • Compliance with NAVSEA Standard Items (NSIs) and SRF-JRMC Local Standard Items (LSIs).

Contract Details

  • Contract Type: Firm Fixed Price (FFP) job order under an existing Master Agreement for Repair and Alteration of Vessels (MARAV).
  • Period of Performance: June 29, 2026, to December 8, 2026.
  • Place of Performance: Yokosuka Naval Base, aboard the USS HIGGINS (DDG 76).
  • Set-Aside: No socio-economic set-asides will be used.

Submission & Evaluation

  • Proposal Submission Deadline: May 18, 2026, at 10:00 AM JST.
  • Work Specification Access: Attachment (I) Work Specification(s) for TGIs are accessible via DoD SAFE. Offerors must have requested access by May 4, 2026, 10:00 AM JST by emailing risa.sakurai.ln@us.navy.mil and peterjommel.s.arrieta.ln@us.navy.mil. Access is valid for 14 days.
  • Proposal Validity: 90 days.
  • Evaluation: Lowest Price Technically Acceptable (LPTA) basis, considering Price, Technical Acceptability, Past Performance, and Responsibility. The Government intends to award without discussions.
  • Required Forms: Bidders must use Attachment (II) Price Proposal Breakdown Sheet for itemized pricing and Attachment (III) Request for Information Sheet for questions.

Eligibility

  • Offerors must be duly authorized to operate and do business in Japan (DFARS 252.225-7042).
  • Must possess an active U.S. Navy Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) as a Prime Contractor.
  • Offerors must be registered in the System for Award Management (SAM).

Key Attachments

  • Attachment (II) Price Proposal Form: Details CLINs (0001 for 7 TGIs, 0002 for Growth) and requires breakdown of labor, material, and ODCs.
  • Attachment (IV) Government Furnished Property (GFP-GFM listings): Lists government-supplied assets.
  • Attachment (VII) Quality Assurance Surveillance Plan (QASP): Outlines government's performance monitoring and evaluation criteria.
  • Exhibits - Contract Data Requirements List (CDRL): Specifies submission requirements for the Integrated Production Schedule (IPS).

Notes

Two additional Technical Guidance Instructions (TGIs) are anticipated and will be distributed when available. All correspondence and questions should be directed to Peter Arrieta or Risa Sakurai via email.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Pre-Solicitation
Posted: May 12, 2026
View
Version 4Viewing
Pre-Solicitation
Posted: May 8, 2026
Version 3
Pre-Solicitation
Posted: May 4, 2026
View
Version 2
Pre-Solicitation
Posted: Apr 9, 2026
View
Version 1
Pre-Solicitation
Posted: Mar 20, 2026
View
USS HIGGINS (DDG 76) 6C1 BUNDLE 3 | GovScope