Solicitation for the Overhaul of the Vibration Control System for the UH-60 Black Hawk

SOL #: W58RGZ-26-R-0001Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-RSA
REDSTONE ARSENAL, AL, 35898-0000, United States

Place of Performance

Redstone Arsenal, AL

NAICS

Other Measuring and Controlling Device Manufacturing (334519)

PSC

Physical Properties Testing And Inspection (6635)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 9, 2026
2
Last Updated
May 11, 2026
3
Submission Deadline
Jun 12, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, ACC-RSA, has issued a solicitation for the overhaul of Vibration Control Systems (NSN: 6635-01-557-9607) for the UH-60 Black Hawk helicopter. This is a Small Business Set-Aside for a Firm Fixed Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract. The purpose is to return these systems to a serviceable condition. Proposals are due by June 12, 2026, at 5:00 PM CDT.

Scope of Work

The contract requires comprehensive overhaul services, including parts, labor, preservation, packaging, packing, marking, and data items for the Vibration Control System. Key tasks include performing a Product Verification Audit (PVA) on three units, with potential contract termination for failure. A separate Contract Line Item Number (CLIN) is included for assets deemed beyond economical repair. Contractors must provide their own containers.

Contract Details

  • Contract Type: Firm Fixed Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ)
  • Period of Performance: Three ordering periods, each 365 days, totaling up to 1,095 days.
  • Quantities: Minimum of 36 units (US quantity) on the first delivery order; maximum estimated quantity of 130 units, including 22 reserved for Foreign Military Sales (FMS).
  • Set-Aside: Small Business
  • NAICS Code: 334519
  • Place of Performance: Redstone Arsenal, AL 35898, United States

Key Requirements & Deliverables

Contractors are required to submit a Maintenance and Overhaul (M&O) Plan within 30 days after contract award. Various reports are mandatory, including Government Property (GP) Inventory Reports (initial within 365 days of GFP receipt, then annually), Shipping and Packaging Discrepancy Reports (SDR), and compliance with Total Asset Visibility – Contractor (TAV-C) requirements for accounting for Government Furnished Equipment/Materiel/Property (GFE/M/P). Packaging must adhere to MIL-STD-129 and MIL-STD-2073-1E, with all Wood Packaging Material (WPM) being ISPM-15 Compliant. Government Furnished Property will not be provided, except for the reparable assets themselves and reusable containers.

Submission & Evaluation

Proposals must be submitted electronically via email. Evaluation will be based on the requirements outlined in the solicitation.

Deadlines

  • Proposal Submission Deadline: June 12, 2026, at 5:00 PM CDT (extended by Amendment 0001).
  • M&O Plan Submission: Within 30 days after contract award.
  • PVA Notification: At least 20 working days prior to the selected PVA date for CONUS facilities.

Contact Information

For inquiries, contact Andrew E. Cameron at andrew.e.cameron.civ@army.mil.

People

Points of Contact

Andrew E. CameronPRIMARY
Lindy L. PinchonSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: May 11, 2026
Version 2
Solicitation
Posted: Apr 2, 2026
View
Version 1
Pre-Solicitation
Posted: Feb 9, 2026
View
Solicitation for the Overhaul of the Vibration Control System for the UH-60 Black Hawk | GovScope