Precast Concrete Components C-Channels and Slabs

SOL #: W912HZ26QA015Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2R2 USA ENGR R & D CTR
VICKSBURG, MS, 39180-6199, United States

Place of Performance

Place of performance not available

NAICS

Other Concrete Product Manufacturing (327390)

PSC

Mineral Construction Materials, Bulk (5610)

Set Aside

Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13) (HZC)

Timeline

1
Posted
Mar 5, 2026
2
Last Updated
Mar 17, 2026
3
Submission Deadline
Mar 19, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE) is soliciting quotes for Precast Concrete Components (C-Channels and Slabs) for delivery to Fort Polk, LA. This opportunity is a 100% HUBZone Small Business Set-Aside and seeks a single award, firm fixed-price purchase order. Quotes are due by March 19, 2026, at 12:00 PM CST.

Scope of Work

The requirement is for various precast concrete components, including:

  • 6-inch-thick C-Channel sections (12 units)
  • 9-inch-thick, TALL C-Channel sections (9 units)
  • Floor Isolation Slabs (9 units)
  • Floor Bearing Pads (18 units)
  • 9-inch-thick, SHORT C-Channel sections (3 units)

All components must meet a concrete compressive strength of 4,500 psi at 28-days, with reports submitted electronically per ASTM C39. Specific dimensions and lifting requirements are detailed in the revised Attachment A (Amendment 0002) drawings.

Contract Details

  • Contract Type: Firm Fixed-Price, single award purchase order (simplified acquisition).
  • Set-Aside: 100% HUBZone Small Business (NAICS 327390, 500-employee size standard).
  • Delivery: Required within 60 days from award.
  • SAM Registration: Offerors must have an active Federal Government contracts registration in SAM at the time of quote submission and award.

Submission & Evaluation

Offerors must submit quotes using the revised Attachment B (Amendment 0002) Quote Submission Form, ensuring all specified content is included. Quotes lacking required content may be deemed unsuccessful. Evaluation factors include:

  1. Technical capability of items to meet requirements, including delivery date.
  2. Past Performance.
  3. Price.

Award will be made to the responsible Offeror whose quote is the Lowest Price, Technically Capable, and has Acceptable Past Performance. The Government reserves the right to award without discussions.

Key Updates & Clarifications

  • Response Date: Extended to March 19, 2026, at 12:00 PM CST.
  • Drawings & Specifications: Attachment A (Amendment 0002) provides updated drawings. All concrete components, including the 9-inch-thick, SHORT C-Channel (Drawing E), now require 4,500 psi compressive strength at 28 days.
  • Bonds: Bid, payment, or performance bonds are not required as this is a supply purchase.
  • Submittals: Shop drawings are not required, but 28-day concrete compressive strength reports (ASTM C39) are mandatory.
  • Unloading: The Government (ERDC) is responsible for unloading precast structures upon delivery.
  • Shipping: Shipping costs must be included in the part/unit price. Quantities filling two trucks within a 24-hour period may be shipped together.
  • Questions: All technical inquiries and questions must be submitted via email to Janalyn.H.Dement@usace.army.mil at least 3 business days prior to the closing date.

People

Points of Contact

Janalyn DementPRIMARY
David AmmermannSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: Mar 17, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Mar 16, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
View
Precast Concrete Components C-Channels and Slabs | GovScope