SOLICITATION FOR NEW RESIDENTIAL HOUSING CONSTRUCTION IN SEWARD, ALASKA
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Coast Guard (USCG) Shore Infrastructure Logistics Center (SILC), through its Civil Engineering Unit - Juneau (CEUJ), has issued a Solicitation for the construction of three new duplex-type family housing units in Seward, Alaska. This Total Small Business Set-Aside opportunity also includes an optional bid item for a maintenance support building. Proposals are due April 21, 2026, at 1:00 PM AKST.
Scope of Work
The selected contractor will provide all necessary labor, materials, equipment, transportation, disposal, and supervision for the construction of the housing units and the optional maintenance support building. The project, identified as PN: 13611688, encompasses all typical trades for new housing construction, including earthwork, utilities, and services. All work must strictly adhere to the Specifications for PN 136116880, Drawings for PN 13611688, and applicable prevailing wage rates (Davis-Bacon Act). Offerors must demonstrate residential building experience.
Contract Details & Timeline
- Contract Type: Firm-Fixed-Price Construction
- Period of Performance: 545 calendar days from the date of award.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS: 236115 (New Single-Family Housing Construction), Size Standard: $45M
- RFI Cutoff Date: April 7, 2026, 12:00 PM AST
- Proposal Due Date: April 21, 2026, 1:00 PM AKST
- Place of Performance: Seward, Alaska
Submission & Evaluation
Proposals must be submitted via email to Cheryl A. Berry and John Wright. Key submission requirements include:
- A Bid Bond for 10% of the proposed price.
- Completed CLIN pricing and a summary price breakdown, incorporating optional items for a support building, metal roofing, premium vinyl siding, and plywood casework.
- Attachment A (Prior Experience Overview) and Attachment B (Experience Information Form) detailing up to three relevant residential projects completed within the last ten years.
- Attachment C (Past Performance Questionnaire) completed by clients.
- Acknowledgment of all amendments (0001, 0002, and 0003). Evaluation will follow a best-value tradeoff process, considering non-price factors such as Planned Approach/Schedule & Risk Mitigation, Prior Experience, Past Performance, Materials Betterment, and Price.
Amendments & Key Updates
- Amendment 0003 (April 1, 2026): Responded to RFIs 6-28, incorporated revised Pricing Schedule (Attachment A), revised sheets C-201 and G-002, and the USCG Seward Housing Project Geotechnical Report. Confirmed RFI cutoff date of April 7, 2026.
- Amendment 0002 (March 23, 2026): Replaced pages 90-98 of the RFP (Sections L.3-M.5), updated submission instructions, and detailed evaluation factors.
- Amendment 0001 (March 12, 2026): Responded to RFIs 1-7, incorporated attachments, and confirmed the proposal due date.