S--Provide Grounds Maintenance - Landscaping Services
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), under the Department of the Interior, is soliciting proposals for Grounds Maintenance and Landscaping Services at the Chattahoochee River National Recreation Area in Fort Moore, GA. This is a Total Small Business Set-Aside opportunity. The solicitation has been amended to include questions and answers and a revised price schedule. Proposals are due by April 6, 2026, at 5:00 PM ET.
Scope of Work
Services include comprehensive grounds care such as mowing, trimming, blowing, litter pick-up, and site clean-up across thirteen (13) specified sites within the recreation area. All work must adhere to the provided Statement of Work (SOW) and detailed Mow Plan, which specifies mowing heights, frequencies, and tasks for each location. Contractors are responsible for hauling organic debris off-site, while NPS dumpsters may be used for trash. Herbicides are not permitted for chemical edging.
Contract Details
- Contract Type: Firm-Fixed Price
- Period of Performance: April 14, 2026, through October 31, 2026 (updated by Amendment 0001 and Q&A).
- Set-Aside: Total Small Business Set-Aside (FAR 19.5). Offerors must be SAM.gov registered and self-certified under NAICS Code 561730.
- Evaluation Criteria: Best Value - Lowest Price Technically Acceptable (LPTA), based on Price, Technical Capability (Acceptable/Unacceptable), and Past Performance (Pass/Fail).
- Wage Determination: Bidders must comply with the Service Contract Act Wage Determination for Georgia, which specifies minimum wage rates and fringe benefits.
Key Updates & Clarifications
Amendment 0001 and Attachment 0007 (Q&A) provide crucial updates:
- This is a new requirement with no incumbent contractor.
- The Period of Performance has been officially confirmed as April 14, 2026, to October 31, 2026.
- Bidders must use the revised Price Schedule (Attachment 0008) and provide both lump sum and monthly costs with distinct line items for each service area.
- A site visit was encouraged to ascertain local conditions, and questions were due by March 19, 2026.
Submission & Deadlines
Quotes must be submitted electronically in three volumes: Technical Capability, Past Performance, and Price. Offerors must acknowledge receipt of Amendment 0001.
- Proposal Due Date: April 6, 2026, 5:00 PM ET.
- Contact: Edward Dingle, edward_dingle@nps.gov, 404-507-5747.