PUMP UNIT. CTFGL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVSUP WEAPON SYSTEMS SUPPORT MECH is soliciting proposals for the repair of PUMP UNIT. CTFGL. This Request for Quote (RFQ) is issued under Emergency Acquisition Flexibilities (EAF) and requires a Repair Turnaround Time (RTAT) of 229 days. Proposals are due May 1, 2026.
Scope of Work
This opportunity covers the repair and quality requirements for the PUMP UNIT. CTFGL. Repairs must meet the operational and functional requirements associated with Cage Code 83130, Reference Number NA1552-1. Contractors are required to perform work in accordance with their standard repair practices, manuals, and approved technical documents. The solicitation includes provisions for handling design changes, material substitutions, and part number updates.
Contract & Timeline
- Type: Solicitation (RFQ for repair), resulting in a bilateral award.
- Set-Aside: None specified.
- Response Due: May 1, 2026 (extended by Amendment 2).
- Published: May 6, 2026 (latest publication date).
Key Requirements
Offerors must verify nomenclature, part number, and NSN before responding. A Government Source Inspection (GSI) is required. Freight is handled by the Navy per the Commercial Asset Visibility (CAV) Statement of Work, with all freight being FOB Origin. Quotes must include unit price, total price, and the proposed Repair Turnaround Time (RTAT). If the Government's required RTAT of 229 days cannot be met, offerors must provide capacity constraints. The RTAT is measured from asset return to acceptance. Provisions for a T&E fee apply if an asset is determined Beyond Repair (BR/BER). Accelerated delivery is encouraged.
Additional Notes
This solicitation has been amended to extend the close date to May 1, 2026, and to incorporate updated solicitation clauses following a "Revolutionary FAR Overhaul." The requirement point of contact has also been updated.