Ramey School Floor Replacement

SOL #: HE125426QE048Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of Defense Education Activity (Dodea)
DOD EDUCATION ACTIVITY
ALEXANDRIA, VA, 22350-1400, United States

Place of Performance

PR

NAICS

Flooring Contractors (238330)

PSC

Maintenance Of Schools (Z1CA)

Set Aside

Economically Disadvantaged WOSB (EDWOSB) Program Set-Aside (FAR 19.15) (EDWOSB)

Timeline

1
Posted
Apr 15, 2026
2
Submission Deadline
Apr 30, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Defense Education Activity (DoDEA) is soliciting quotes for the Ramey School Floor Replacement project in Aguadilla, Puerto Rico. This Firm Fixed-Price contract requires the removal of existing flooring and installation of new flooring in two classrooms. This acquisition is set aside for Women-Owned Small Businesses (WOSB). Quotes are due by April 30, 2026, at 04:00 PM Local Time.

Opportunity Details

DoDEA operates 160 accredited schools globally, serving children of active-duty military and DoD civilian families. Ramey Unit School, located in northwest Puerto Rico, serves approximately 500 students from Pre-K through 12th grade. This project is crucial for maintaining the school's facilities.

Scope of Work

The requirement involves comprehensive floor replacement services for two classrooms, totaling approximately 1,636 square feet. Key tasks include:

  • Demolition: Removal of all existing flooring materials, adhesives, and fasteners.
  • Subfloor Preparation: Inspection, correction of deficiencies, and leveling to ensure a flat, smooth surface.
  • Installation: Installation of new vinyl flooring (LVT or Sheet Vinyl) according to manufacturer specifications.
  • Cleanup & Disposal: Proper disposal of all construction debris and excess materials. The contractor is responsible for providing all labor, materials, tools, equipment, and supervision. Work must be completed during the school summer break (June 8, 2026, to August 10, 2026).

Contract & Timeline

  • Contract Type: Firm Fixed Price (FFP)
  • Period of Performance: June 8, 2026, to August 10, 2026
  • Set-Aside: Women-Owned Small Business (WOSB)
  • NAICS Code: 238330
  • Product Service Code (PSC): Z1CA (Maintenance Of Schools)
  • Quotes Due: April 30, 2026, at 04:00 PM Local Time
  • Published Date: April 15, 2026

Special Requirements & Deliverables

  • Security: Personnel require necessary security clearances for DoD networks/systems and base access pre-clearance.
  • Access: Coordinate building access with DoDEA security. Work hours are restricted to authorized times during summer break.
  • Compliance: Adherence to federal, state, local building codes, safety regulations (OSHA, EM-385), and manufacturer guidelines.
  • Materials: Proposed flooring material types and colors must be submitted to the COR/FOS for approval.
  • Deliverables: Work/Installation Schedule, Request for Flooring Type, Before/During/After Photos, Pre-Inspection, and Final Inspection.

Submission & Evaluation

  • Submission: Electronically via email to the Contracting Officer and Contract Specialist.
  • Evaluation: Based on Price and Technical Capability, utilizing a Lowest Price Technically Acceptable (LPTA) approach. The agency will evaluate prices first, then assess the lowest-priced quote for technical acceptability.
  • Eligibility: Offerors must be registered in the System for Award Management (SAM).
  • Notes: Prices must be held firm for 120 calendar days. Payment requests via Wide Area WorkFlow (WAWF).

People

Points of Contact

Sarah AdanPRIMARY
Emani GraySECONDARY

Files

Files

Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Apr 15, 2026
Ramey School Floor Replacement | GovScope