Redzikowo Poland Site Activation Facility

SOL #: N3319126P0001Award Notice

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM EUROPE AFRICA CENTRAL
FPO, AE, 09622-0051, United States

Place of Performance

Redzikwowo, Poland

NAICS

No NAICS code specified

PSC

Lease Or Rental Of Equipment: Miscellaneous (W099)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 17, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy (NAVFACSYSCOM EUROPE AFRICA CENTRAL) has issued a Justification for Other Than Full and Open Competition (JOFOC) for the acquisition of a modular office facility in Redzikowo, Poland. This single-source determination is for administrative space required by the Forward Deployed Regional Maintenance Center (FDRMC) supporting the Aegis Ashore Missile Defense System (AAMDS). The estimated maximum value for a 12-month base lease is $133,300.00.

Scope of Requirement

This requirement is for a modular office facility to provide essential administrative space for the FDRMC. The facility is critical for supporting the Aegis Ashore Missile Defense System (AAMDS) operations in Redzikowo, Poland.

Contract & Timeline

  • Type: Single Source Acquisition (Justification for Other Than Full and Open Competition)
  • Duration: Base lease of 12 months (approximately December 2025 - November 2026), with an option for demobilization.
  • Value: Estimated maximum of $133,300.00.
  • Set-Aside: None (single source determination).
  • Published: April 17, 2026.
  • Place of Performance: Redzikowo, Poland.

Justification for Single Source

The government has determined that soliciting from a single source is necessary due to "Other Reasons" as defined by FAR 13.106-1(b). Awarding to another contractor would result in unacceptable interference and delays in fulfilling FDRMC's requirements, potentially causing a significant break in infrastructure support. Shifting to a new contractor would necessitate demolition and re-installation of facilities, leading to a period of up to six months without essential facilities, which would negatively impact FDRMC's ability to perform critical maintenance on the AAMDS. Additionally, significant cost risks are associated with mobilization and installation by an unfamiliar contractor.

People

Points of Contact

No contacts available

Files

Files

Download

Versions

Version 1Viewing
Award Notice
Posted: Apr 17, 2026
Redzikowo Poland Site Activation Facility | GovScope