Y--Renewal of Fort Point Restrooms, GOGA

SOL #: 140P8626Q0011Solicitation

Overview

Buyer

Interior
National Park Service
PWR GOGA(86000)
SAN FRANCISCO, CA, 94123, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 9, 2026
2
Last Updated
Mar 30, 2026
3
Submission Deadline
Apr 9, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), under the Department of the Interior, is seeking proposals for the Renewal of Fort Point Restrooms at the Golden Gate National Recreation Area. This is a Total Small Business Set-Aside solicitation for a firm-fixed-price purchase order. Quotations are due by Thursday, April 9, 2026, at 12:00 PM PDT.

Scope of Work

The project involves comprehensive renovation of the Fort Point Restrooms. Key tasks include:

  • Window Replacement: Two windows and frames, matching existing size, operation, finish, and glazing.
  • Restroom Fixtures: Replacement of sinks, urinals, toilets, and associated hardwired connections, along with toilet compartments (stainless steel partitions) and accessories (soap dispensers, mirrors, baby changing stations).
  • Painting: Interior and exterior painting of walls, doors, trim, and previously painted gutters/downspouts. The entire exterior will be painted.
  • Interior Flooring: Cleaning, preparation, and recoating of existing epoxy flooring; substrate repairs or leveling are excluded.
  • Exterior Lighting: Replacement of six outdoor lights.
  • Drinking Fountain: Replacement of an outdoor drinking fountain.
  • Mobilization/Demobilization: Including provision of four temporary portable toilets (at least one ADA compliant) for public use and temporary fencing.
  • An option item for "Replacement of Copper Grate" is also included. The existing electrical panel is functional and does not require upgrading. Fixing broken siding on the back of the building is part of the scope.

Contract Details

  • Contract Type: Firm-fixed-price purchase order.
  • Estimated Value: Between $25,000 and $100,000.
  • Period of Performance: Work to commence within 10 calendar days after Notice to Proceed and be completed within 60 calendar days.
  • Set-Aside: Total Small Business Set-Aside.
  • Bonds: Payment bond required for awards over $35,000; both payment and performance bonds for awards over $150,000.
  • Licenses: Contractors must possess a California "B" General Building Contractor license.
  • Wage Rates: Davis-Bacon Wage Rates apply.

Submission & Evaluation

  • Submission Deadline: Thursday, April 9, 2026, at 12:00 PM PDT.
  • Submission Method: Electronically via email to Quinn Rankin (Quinn_Rankin@ios.doi.gov).
  • Evaluation Criteria: Award will be based on the most advantageous quotation to the Government, considering:
    1. Price
    2. Relevant Experience
    3. Past Performance (using Attachment 4 form)
    4. California Contractor State License ("B" General Building Contractor)
    5. Technical Approach
  • Required Forms: Bidders must complete Attachment 4 (Technical Info Form-Past Performance) detailing company information, proposed team, and up to three relevant past projects for both prime and subcontractors.

Key Documents & Clarifications

  • Amendment 0001: Extended the quote deadline to April 9, 2026.
  • Amendment 0002: Added Attachment 5 (Questions & Answers), the site visit sign-in sheet, and REVISED Specifications.
  • Attachment 5 (Q&A): Provided clarifications on electrical, siding, exterior lights, painting, temporary restrooms, flooring scope, window replacement, and temporary fencing.
  • REVISED Construction Specifications: Details technical requirements for all aspects of the renovation, including materials, installation, safety, and environmental protection.
  • Attachment 2: Provides photos and a map of the site.

Contact Information

For inquiries, contact Quinn Rankin at Quinn_Rankin@ios.doi.gov.

People

Points of Contact

Rankin, QuinnPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: Mar 30, 2026
Version 2
Solicitation
Posted: Mar 26, 2026
View
Version 1
Solicitation
Posted: Mar 9, 2026
View
Y--Renewal of Fort Point Restrooms, GOGA | GovScope