RENO BOTTOMS HREP - STAGE 2 - ICE HAUL SLOUGH
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, W07V ENDIST ST PAUL, has issued a Presolicitation for the RENO BOTTOMS HREP - STAGE 2 - ICE HAUL SLOUGH project. This opportunity is designated as a Total Small Business Set-Aside (FAR 19.5) and aims to restore and protect diverse bottomland forest habitat in Pool 9 of the Mississippi River. The notice was published on May 20, 2026.
Scope of Work
This contract involves the construction of island enhancement features and an Ice Haul closure structure within the backwater area of Pool 9 of Reno Bottoms. Key tasks include:
- Constructing structures using fine fill materials obtained from habitat dredging.
- Utilizing granular material from offsite stockpiles.
- Providing and placing riprap along selected shorelines to protect the constructed island features.
Contract & Timeline
- Contract Opportunity Type: Presolicitation
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Product/Service Code: Y1PZ (Construction Of Other Non Building Facilities)
- Published Date: May 20, 2026
- Response Date: Not specified in this presolicitation notice.
Additional Notes
This presolicitation is for planning purposes. Interested parties should monitor SAM.gov for the release of the formal solicitation. For inquiries, contact Justin Rose at JUSTIN.H.ROSE@USACE.ARMY.MIL or 651-290-5422.