Repair ADM Baker Pool Complex
SOL #: NAVMWR-26-R-0029Solicitation
Overview
Buyer
Dept Of Defense
Dept Of The Navy
COMMANDER NAVY INSTALLATIONS CMD
MILLINGTON, TN, 38055-6500, United States
Place of Performance
San Diego, CA
NAICS
Fitness and Recreational Sports Centers (713940)
PSC
Recreational And Gymnastic Equipment (7830)
Set Aside
No set aside specified
Original Source
Timeline
1
Posted
Mar 12, 2026
2
Last Updated
May 11, 2026
3
Submission Deadline
Jun 5, 2026, 8:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy is soliciting proposals for the Repair ADM Baker Pool Complex in San Diego, CA. This project involves significant renovations to meet high demand and ensure safety, including upgrading the main pool, converting a wading pool into a splash pad, and renovating the snack bar and locker room. The latest amendment extends the proposal due date to June 05, 2026.
Scope of Work
The project encompasses comprehensive upgrades to the ADM Baker Pool Complex. Key elements include:
- Upgrading the main pool.
- Converting the existing wading pool into an approximately 800 sq ft splash pad, targeting ages 0-5, with potential for up to 15 units.
- Renovation of the snack bar and locker room facilities.
- Clarifications from multiple amendments address various aspects:
- Site visit details for fiber optic, slide manufacturer, and suction pipe photos.
- The existing slide pump is inoperable and may need replacement; pool depth at slide entry is 12 feet.
- A 2,500-gallon water tank is proposed, meeting national codes.
- Standard manufacturer warranty is acceptable; quarterly maintenance can extend splash pad/slide life.
- Mechanical building location for splash pad treatment system depends on available space.
- 3-phase power is available; wading pool plumbing is separate from lap pool.
- Demolition of internal chainlink fencing around gazebos (approx. 250 LF) is required, while the main pool complex fence (approx. 660 LF) remains.
- City of San Diego permitting is not required; only NAVFAC permitting.
- Mold remediation is required if encountered.
- Environmental studies are attached; parking lot improvements are not included.
- The pool was closed due to deteriorated plaster and water slide structure.
Contract & Timeline
- Type: Solicitation
- Set-Aside: None specified
- Product Service Code: 7830 (Recreational And Gymnastic Equipment)
- Proposal Due: June 05, 2026, at 20:00:00Z (extended by Amendment 0007)
- Published: May 11, 2026 (latest amendment date)
- Original Published: March 12, 2026
Key Amendments & Clarifications
- Amendment 0001 detailed a pre-proposal conference held on March 26, 2026.
- Amendment 0002 added the pre-proposal meeting minutes.
- Amendment 0003 extended the proposal due date to May 14, 2026.
- Amendment 0004, 0005, and 0006 provided extensive answers to Requests for Information (RFIs), clarifying scope details, site conditions, and permitting requirements.
- Amendment 0007 further extended the proposal due date to June 05, 2026.
Contact Information
For inquiries, contact Alanna Young, Contracting Officer, at alanna.g.young.naf@us.navy.mil or 901-574-0848.
People
Points of Contact
Alanna Young, Contracting OfficerPRIMARY
Files
Versions
Version 11Viewing
Solicitation
Posted: May 11, 2026
Version 10
Solicitation
Posted: May 11, 2026
Version 9
Solicitation
Posted: May 11, 2026
Version 8
Solicitation
Posted: May 11, 2026
Version 7
Solicitation
Posted: Apr 29, 2026
Version 6
Solicitation
Posted: Apr 22, 2026
Version 5
Solicitation
Posted: Apr 21, 2026
Version 4
Solicitation
Posted: Apr 13, 2026
Version 3
Solicitation
Posted: Mar 27, 2026
Version 2
Solicitation
Posted: Mar 24, 2026
Version 1
Solicitation
Posted: Mar 12, 2026