Request for Industry Feedback - Construction Manager as Advisor (CMa) services, NAVFAC Washington
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
NAVFAC Washington has issued a Request for Industry Feedback (RFI) for Construction Manager as Advisor (CMa) services. This RFI seeks constructive feedback on a draft Statement of Work (SOW), draft evaluation criteria, and a suggested pricing structure for a potential future opportunity. Responses are due by May 14, 2026.
Scope of Work (Draft)
The potential CMa services encompass Program Management (PgM), Project Management (PM), and Construction Management as Advisor (CMa) for facility and infrastructure projects within NAVFAC Washington's Area of Responsibility (AOR). Key responsibilities include pre-award planning, design, procurement, and post-award construction/post-construction phases for various project types (MILCON, FSRM, REIM). Services involve managing quality, cost, time, communications, and administration, including site visits, inspections, submittal/RFI process management, schedule/cost analysis, technical analysis, and payment request review. The CMa may be required to supply specific personnel (e.g., Project Manager, Construction Manager, Scheduler) with defined qualifications. PgM support includes expert-level assistance for large capital improvement programs, covering planning, integration, requirements, financial management, acquisition, performance monitoring, and risk management.
Contract & Timeline
- Type: Special Notice (Request for Industry Feedback)
- Set-Aside: None specified (informational RFI)
- Response Due: May 14, 2026, 6:00 PM ET
- Published: May 8, 2026
Draft Evaluation Factors
Future proposals for this opportunity may be evaluated based on the following factors, with technical factors (1-4) being equally important to each other, and technical factors combined being equally important to Past Performance (Factor 5). Technical factors and Past Performance combined are equally important to Price.
- Management Approach: Assesses organizational structure, staffing strategy, and capacity.
- Key Personnel: Evaluates qualifications, experience, and certifications of proposed personnel.
- Experience: Assesses depth and breadth of relevant PgM, PM, and CM experience.
- Safety: Evaluates the Offeror's safety approach and metrics.
- Past Performance: Assesses performance on relevant projects using CPARS or questionnaires.
Additional Notes
This RFI is for informational purposes only and does not constitute a solicitation or commitment by NAVFAC Washington. No contract will be awarded based on this request, and participation is voluntary. Feedback, including questions, comments, or concerns, should be submitted using the attached "CMa Submission Form" via email to Lindsay Brown at Lindsay.m.brown14.civ@us.navy.mil. Proprietary information should be identified. Any information provided is subject to change, and a formal RFP would be published separately if generated.