Request for Information - Next Generation Penetrator Tail Kit Development

SOL #: EBDA_NGPTK_RFISources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8681 AFLCMC EBD
EGLIN AFB, FL, 32542-6883, United States

Place of Performance

Place of performance not available

NAICS

Search (334511)

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
Feb 23, 2026
2
Last Updated
Mar 18, 2026
3
Response Deadline
Mar 25, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, AFLCMC/EBD, has issued a Request for Information (RFI) for the Next Generation Penetrator Tail Kit Development. This RFI seeks industry capabilities to develop and produce a materiel solution, serving as market research to inform future acquisition strategies. White paper responses are due by March 25, 2026, at 1400 CDT.

Purpose

This RFI is for market research purposes only and does not constitute a solicitation. The Air Force aims to characterize technological, manufacturing, and business capabilities to inform a trade space analysis for potential technology demonstration needs related to the Next Generation Penetrator Tail Kit.

Scope of Work

The Air Force is seeking information on capabilities related to:

  • TK Design Maturation: Maturing a Government-supplied technical data package (TDP) for a Weapon Open System Architecture (WOSA) designed tail kit (TK) at the Preliminary Design Review (PDR) level.
  • OFP Software Development: Developing operational flight program (OFP) software for the provided tail kit.
  • Software-in-the-Loop (SIL) Testing: Planning, organizing, and conducting SIL testing, including analysis of impact accuracy.
  • Hardware Production: Producing 3 to 5 functioning full-scale TK systems.
  • Hardware-in-the-Loop (HIL) Testing: Planning, organizing, and conducting HIL testing, including analysis of functionality.
  • Flight Testing/Integration: Building tail kits for developmental test series (18-21 flights), providing support and data analysis, and supporting aircraft integration for flight certification.
  • Rough Order of Magnitude (ROM): Information on ROM for software development, hardware procurement, HIL/SIL testing, and optional follow-on efforts is requested.

Submission Details

  • Response Type: White papers detailing capabilities for software, hardware, flight test/integration, or a combination.
  • Page Limits: Specific page limits apply based on the scope of the submission (e.g., 10 pages for software only, 20 pages for all-inclusive).
  • File Formats: Only .pdf, .docx, and .xlsx documents are allowable.
  • Response Due: March 25, 2026, at 1400 CDT.
  • Questions Deadline: The deadline for questions was March 9, 2026, 1200 CDT. Responses to questions were posted on March 18, 2026.

Eligibility & Set-Aside

The Government encourages all responsible businesses, including small businesses, to respond. Respondents should indicate their size in relation to NAICS Code 334511 and their socio-economic status. The Government reserves the right to consider a small business set-aside based on responses. All prospective vendors must be registered in the System for Award Management (SAM) database.

Additional Notes

A controlled document with additional system attribute details was available upon request via DD Form 2345, with access extended until March 18, 2026. Responses to this RFI are voluntary and will not affect future bidding opportunities. No payment will be made for costs incurred in responding. For this RFI, the page count is inclusive of all items.

People

Points of Contact

Mandi JohnsonPRIMARY
Christy CrossSECONDARY

Files

Files

Download
Download
Download

Versions

Version 3Viewing
Sources Sought
Posted: Mar 18, 2026
Version 2
Sources Sought
Posted: Mar 16, 2026
View
Version 1
Sources Sought
Posted: Feb 23, 2026
View
Request for Information - Next Generation Penetrator Tail Kit Development | GovScope