Riverside Day Use Area Rehabilitation
SOL #: 127EAW26Q0016Combined Synopsis/Solicitation
Overview
Buyer
Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 6
Albuquerque, NM, 871023498, United States
Place of Performance
CA
NAICS
Highway (237310)
PSC
Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Feb 25, 2026
2
Last Updated
Mar 24, 2026
3
Submission Deadline
Mar 30, 2026, 6:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is soliciting quotations for the Riverside Day Use Area Rehabilitation project at Stanislaus National Forest, California. This Total Small Business Set-Aside opportunity involves repairing flood-damaged infrastructure, including a trail bridge, hand pump well, asphalt, and a retaining wall. An amendment has revised the Statement of Work and extended deadlines. Quotes are due March 30, 2026.
Scope of Work
This project entails the rehabilitation of the Riverside Day Use Area, which sustained damage from past flood events. Key tasks include:
- Wooden Trail Bridge: Fabrication, delivery, and installation of a new wooden trail bridge.
- Trail Bridge Substructure & Retaining Wall Repair: Construction of a stone-faced, reinforced concrete retaining wall and repair of eroded areas, replacing damaged gabion cells.
- Asphalt Repair: Patching and repairing existing asphalt surfaces on the trail.
- Hand Pump Repair: Restoration of a well with a hand pump to operational status, including flushing, disinfection, and testing, adhering to federal, state, and local drinking water requirements.
- Mobilization: Preparatory work and movement of personnel, equipment, and supplies to the project site.
Contract Details
- Opportunity Type: Combined Synopsis/Solicitation (Request for Quotation - RFQ)
- Award Type: Firm Fixed Price
- Estimated Magnitude: Between $25,000 and $100,000
- Period of Performance: 45 calendar days from Notice to Proceed (NTP), with work commencing within 10 days of NTP.
- Set-Aside: Total Small Business Set-Aside
- NAICS Code: 237310 – Highway, Street, and Bridge Construction
- Small Business Size Standard: $45M
- Place of Performance: Stanislaus National Forest, Riverside Day Use Area, Tuolumne, CA
Submission & Evaluation
- Quote Submission Deadline: March 30, 2026, at 11:00 AM PDT.
- Requests for Information (RFIs) Deadline: March 23, 2026, at 10:00 AM PDT. RFIs must be submitted using the provided form to tanya.torres@usda.gov.
- Submission Method: Quotes must be emailed to tanya.torres@usda.gov.
- Evaluation Criteria: Quotes will be assessed based on Technical Approach, Past Performance, and Price. Award will be made to the offeror representing the best value to the Government.
- Required Documents: Bidders must complete the "Schedule of Items" with pricing for all items and provide company information (Name, Address, UEI, POC, Phone, Email, Tax ID).
Key Requirements & Notes
- Licensing: Contractors must hold a valid California contractor's license, with a specific C-57 Well Drilling Contractor's license required for hand-pump work.
- SAM.gov: Offerors must have an active entity registration at SAM.gov.
- Prevailing Wages: Davis-Bacon Act prevailing wage rates apply.
- Fire Plan: Compliance with the "Fire Plan for Construction and Service Contracts" is mandatory, especially during the Fire Precautionary Period (April 1 - December 1 in California).
- Administrative: Invoicing will be via the Invoice Processing Platform (IPP). Key personnel (Field Superintendent, Safety Manager, Quality Control Manager) are required. Specific insurance coverages are mandated.
Contact Information
- Primary Contact: Tanya Torres
- Email: tanya.torres@usda.gov
People
Points of Contact
Tanya TorresPRIMARY