ROD, PUSH
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP WEAPON SYSTEMS SUPPORT MECH, has issued a Solicitation for 22 units of ROD, PUSH (NSN 1HM 3040-01-512-3845 L1). This material is designated as SPECIAL EMPHASIS (Level I) for a crucial shipboard system. This opportunity is a Total Small Business Set-Aside (FAR 19.5). Quotations are due by close of business on June 9, 2026.
Scope of Work
This Request for Quotations (RFQ) requires the provision of "ROD, PUSH" material, which is critical for shipboard systems where failure could lead to serious personnel injury, loss of life, or loss of vital shipboard systems. Key requirements include:
- Material: QQ-N-286, Hot Finished and Age Hardened, with a Brinell Hardness of 265-320.
- Welding is strictly not permitted on QQ-N-286 material.
- Quantitative chemical and mechanical analysis is mandatory.
- Required Testing Certification: Age Hardening, Ultrasonic Inspection on Starting Material, and Slow Strain Rate Tensile Test.
- Traceability and Certification Requirements are critical.
- Packaging must adhere to MIL-STD-2073.
- Hazardous Material Identification and Material Safety Data must be provided if applicable.
- Mercury and mercury-containing compounds must not be intentionally added or come into direct contact with hardware.
Contract & Timeline
- Contract Type: Solicitation (RFQ) for a "DO" rated order, certified for national defense use under the Defense Priorities and Allocations System (DPAS).
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Quotations Due: Close of business on June 9, 2026.
- Published Date: April 29, 2026.
- Period of Performance: Delivery is required within 365 days after contract award.
- Certification Data CDRLs: Submission is required on or before 20 days prior to scheduled delivery.
Evaluation
While not explicitly detailed, past performance is considered more important than price for this acquisition. PNSY review/acceptance of Certification CDRLs will take 30 working days after receipt.
Additional Notes
This solicitation is issued pursuant to Emergency Acquisition Flexibilities (EAF). The NAVSUP WSS Portsmouth's DODAAC has changed from NOO102 to N50286. A DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. Access to drawings, if included, must be requested via SAM.gov, followed by an email to the Primary POC. The material is designated as "Level One."
Primary Contact: LT NATHANIEL VENTURA (NATHANIEL.VENTURA.MIL@US.NAVY.MIL).