RPR Sewer & Power Plant Genset & ATS, MULTI

SOL #: FA557526B0002Pre-Solicitation

Overview

Buyer

APO, AE, 09643-6585, United States

Place of Performance

Sevilla, ES-AN, Spain

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Generators And Generator Sets, Electrical (6115)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 17, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The United States Air Force intends to issue solicitation FA5575-26-B-0002 for a Firm-Fixed Price contract to design and install emergency generators and Automatic Transfer Switches (ATS) at the Base Power Plant (Bldg #212) and Sewage Treatment Plant (Bldg #1215) in Sevilla, Spain. This project aims to provide emergency power supply to these critical facilities. The estimated magnitude of construction is between $500,000 and $1,000,000 USD.

Scope of Work

The project involves the design and installation of new permanent emergency generators with ATS and By-Pass/Isolation Switches (BP/IS) for two main locations:

  • Building #212 (Base Power Plant): Provide and install a new EPA-compliant emergency generator, 4-pole ATS, and BP/IS within the existing electrical room. This includes removing existing generator connections, installing new service lines, ductbanks/manholes, a new Main Distribution Panel, and adequate grounding. A red flashing beacon will indicate emergency power operation.
  • Building #1216 (Sewage Treatment Plant): Provide and install a new EPA-compliant emergency generator, 4-pole ATS, and BP/IS within a new concrete pre-manufactured utility vault. This also includes removing existing generator connections, installing new high-voltage switchgear, transformer, low-voltage panelboard, service lines, ductbanks/manholes, and adequate grounding. A red flashing beacon will be installed on the new utility vault. Additionally, a new underground high voltage distribution system will replace existing overhead sections in the area.
  • Miscellaneous: Testing and commissioning, delivery of As-built drawings, and delivery of Spatial Data.

Contract & Timeline

  • Type: Firm-Fixed Price (FFP) contract, procured via Two-Step Sealed Bidding (RFO 14 and RFO 36).
  • Estimated Value: $500,000 - $1,000,000 USD.
  • Period of Performance: Estimated 730 calendar days.
  • Step One Instructions Availability: On or after May 4, 2026, on SAM.gov.
  • Published: April 17, 2026.

Key Requirements

This opportunity is open only to companies authorized to operate in Spain under Spanish law and meeting Spanish legislation for government works.

  • Certification of Classification: Bidders and/or subcontractors must hold an updated Certificate of Classification from the "Registro Oficial de Licitadores y Empresas Clasificadas del Estado" covering Groups I, Subgroups 1, 5, and 6, Category 2.
  • Electrical Certification: Bidders or subcontractors performing electrical work must hold current AT1 certification for high voltage electrical installations (not exceeding 30 kV) in accordance with ITC-RAT 21 from R.D. 337/2014.
  • Local Content: Spanish material, labor, and equipment shall be used whenever feasible.
  • Evaluation: Only offerors with an acceptable technical proposal in Step One will proceed to Step Two and receive an Invitation for Bids. Additional requirements (A&E Design, schedule, past experience) will be detailed in Step One instructions.

Additional Notes

This is a presolicitation notice. Interested parties should monitor SAM.gov for the release of Step One instructions.

People

Points of Contact

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Pre-Solicitation
Posted: Apr 17, 2026
RPR Sewer & Power Plant Genset & ATS, MULTI | GovScope