Sam Houston Trail Bridge Replacement
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service, Region 3, is soliciting proposals for the Sam Houston Trail Bridge Replacement project. This Total Small Business Set-Aside opportunity involves the design and construction of approximately 18 trail bridges on the Multi-Use Trail (MUT) within the Sam Houston National Forest, west of New Waverly, TX. The estimated magnitude of construction is between $1,000,000 and $5,000,000. Proposals are due May 29, 2026, at 14:00 CST.
Scope of Work
This firm-fixed-price Design-Build contract requires all labor, materials, equipment, and supervision for the full design and construction of the bridges. The project is divided into three phases:
- Phase A: Site Investigation and Analysis.
- Phase B: Design and Construction Document Preparation. A design narrative explaining assumptions, proposed design type, foundations, and materials is sufficient for the bid submittal, demonstrating best value.
- Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and construction and connection of trail approaches. Bridges must have a minimum deck width of 72 inches, increased spans, and freeboard, designed to withstand a 500-year storm interval with 30% debris blocking and 18 inches of freeboard. The contractor may adopt a phased approach due to the number and varied locations of sites.
Contract Details
- Contract Type: Firm-Fixed-Price Design-Build construction contract.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- NAICS Code: 237310 – Highway, Street, and Bridge Construction, with a $45 million size standard.
- Magnitude: Between $1,000,000 and $5,000,000.
- Period of Performance: 390 calendar days after receipt of the Notice to Proceed (NTP).
- Bonding: 100% performance and payment bonds are required within 10 calendar days of award.
- Place of Performance: Sam Houston National Forest, Lufkin, TX.
Submission & Evaluation
Proposals must be submitted electronically to david.l.watson@usda.gov and organized into two volumes: Technical Proposal and Price Proposal. Evaluation will be based on a Best Value Tradeoff, considering Technical Approach, Relevant Experience, Key Personnel (Project Manager, Design Engineer, Construction Superintendent), Past Performance, and Price. Non-price factors combined are approximately equal to price. Offerors are strongly encouraged to visit the project site; a pre-bid meeting was held on April 3, 2026.
Key Dates & Contacts
- Proposals Due: May 29, 2026, at 14:00 CST.
- Primary Contact: DAVID WATSON, DAVID.L.WATSON@USDA.GOV, (480) 204-9319.
Attachments
Key attachments include detailed pricing sheets (Attachment_03_SOI.xlsx), structure summaries (Attachment_06_StructureSummaries.xlsx), and various vicinity and trails maps.