Sam Houston Trail Bridge Replacement

SOL #: 127EAV26R0009Solicitation

Overview

Buyer

Agriculture
Forest Service
Southwestern Regional Office, Region 3
ALBUQUERQUE, NM, 87102, United States

Place of Performance

Lufkin, TX

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 9, 2026
2
Last Updated
May 9, 2026
3
Submission Deadline
May 29, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service, Region 3, is soliciting proposals for the Sam Houston Trail Bridge Replacement project. This Total Small Business Set-Aside opportunity involves the design and construction of approximately 18 trail bridges on the Multi-Use Trail (MUT) within the Sam Houston National Forest, west of New Waverly, TX. The estimated magnitude of construction is between $1,000,000 and $5,000,000. Proposals are due May 29, 2026, at 14:00 CST.

Scope of Work

This firm-fixed-price Design-Build contract requires all labor, materials, equipment, and supervision for the full design and construction of the bridges. The project is divided into three phases:

  • Phase A: Site Investigation and Analysis.
  • Phase B: Design and Construction Document Preparation. A design narrative explaining assumptions, proposed design type, foundations, and materials is sufficient for the bid submittal, demonstrating best value.
  • Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and construction and connection of trail approaches. Bridges must have a minimum deck width of 72 inches, increased spans, and freeboard, designed to withstand a 500-year storm interval with 30% debris blocking and 18 inches of freeboard. The contractor may adopt a phased approach due to the number and varied locations of sites.

Contract Details

  • Contract Type: Firm-Fixed-Price Design-Build construction contract.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 237310 – Highway, Street, and Bridge Construction, with a $45 million size standard.
  • Magnitude: Between $1,000,000 and $5,000,000.
  • Period of Performance: 390 calendar days after receipt of the Notice to Proceed (NTP).
  • Bonding: 100% performance and payment bonds are required within 10 calendar days of award.
  • Place of Performance: Sam Houston National Forest, Lufkin, TX.

Submission & Evaluation

Proposals must be submitted electronically to david.l.watson@usda.gov and organized into two volumes: Technical Proposal and Price Proposal. Evaluation will be based on a Best Value Tradeoff, considering Technical Approach, Relevant Experience, Key Personnel (Project Manager, Design Engineer, Construction Superintendent), Past Performance, and Price. Non-price factors combined are approximately equal to price. Offerors are strongly encouraged to visit the project site; a pre-bid meeting was held on April 3, 2026.

Key Dates & Contacts

  • Proposals Due: May 29, 2026, at 14:00 CST.
  • Primary Contact: DAVID WATSON, DAVID.L.WATSON@USDA.GOV, (480) 204-9319.

Attachments

Key attachments include detailed pricing sheets (Attachment_03_SOI.xlsx), structure summaries (Attachment_06_StructureSummaries.xlsx), and various vicinity and trails maps.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6Viewing
Solicitation
Posted: May 9, 2026
Version 5
Solicitation
Posted: Apr 10, 2026
View
Version 4
Solicitation
Posted: Mar 26, 2026
View
Version 3
Solicitation
Posted: Mar 17, 2026
View
Version 2
Solicitation
Posted: Mar 17, 2026
View
Version 1
Pre-Solicitation
Posted: Feb 9, 2026
View
Sam Houston Trail Bridge Replacement | GovScope