Y--Santa Ana NWR Design Build Shade Structure

SOL #: 140FC126Q0007Award Notice

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS, CONSTRUCTION A/E TEAM 1
Falls Church, VA, 22041, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 9, 2026
2
Last Updated
Mar 19, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Fish and Wildlife Service (FWS) is soliciting proposals for a Design-Build Shade Structure project at the Santa Ana National Wildlife Refuge in Hidalgo County, Texas. This 100% Small Business Set-Aside opportunity requires the design and construction of two new shade structures to support native habitat restoration efforts. The project involves demolition of existing structures and integration of new, permanent shade solutions for plant seedlings. Proposals are due by March 9, 2026.

Scope of Work

The project's objective is to design and construct shade structures for up to 200,000 plant seedlings at the Santa Ana National Wildlife Refuge's Marinoff Reveg Facility. The scope includes:

  • Demolition of existing shade structures and related infrastructure.
  • Construction of two new shade structures, each approximately 7,000 square feet and 8 feet high, featuring manually operated retractable shade panels suspended by aircraft cables.
  • Integration of a sprinkler system for growing and staging areas (over existing irrigation, not new installation).
  • Provision of all necessary design documentation, including drawings, sketches, parts lists, and proposed work details for future maintenance.
  • Adherence to International Building Code, ASCE-7, and local codes for wind and other loads.

Contract Details

  • Contract Type: Firm-Fixed-Price.
  • Set-Aside: 100% Small Business Set-Aside.
  • Acquisition Procedures: Simplified Acquisition Procedures (FAR Part 13).
  • Period of Performance: 150 calendar days after the Notice to Proceed.
  • Evaluation Methodology: Lowest-Priced Technically Acceptable (LPTA). Award will be made to the responsible offeror with the lowest evaluated price that is technically acceptable and meets all requirements.
  • Wage Determination: TX20260255, dated January 2, 2026, for Hidalgo County, Texas, applies.

Key Requirements & Deliverables

  • The Design-Builder (DB) must be licensed in Texas and responsible for all design, permitting, construction, and related services.
  • Designers must hold a current license to practice in Texas.
  • Deliverables include a Design/Build Management Plan, 65% Design Development documents, 100% Construction Documents, Operation and Maintenance Manuals, spare parts, maintenance materials, and as-constructed drawings.
  • A bid guarantee is required in accordance with FAR 52.228-1. Failure to submit may result in a nonresponsive quote.
  • Contractors must maintain liability insurance covering work on the Government installation, naming both the contractor and the U.S. Government as insured. A Certificate of Insurance (COI) is required before work begins.

Amendments & Clarifications

Multiple amendments have been issued, with the latest (Amendment 0003, dated March 3, 2026) confirming the following:

  • The proposal due date has been extended to March 9, 2026.
  • An erroneous reference to Kenai NWR in Section B has been corrected.
  • Attachment 4, "Questions and Answers" (dated February 24, 2026), has been added, clarifying insurance requirements, bid guarantee necessity, and confirming the site visit proceeded as scheduled.
  • The Government does not anticipate answering further questions after the issuance of Amendment 0003.

Submission Requirements

  • Proposals must be submitted in two volumes: Pricing and Technical.
  • The Technical Volume must demonstrate understanding of requirements, a credible construction approach, relevant experience, a feasible project schedule, and compliance.
  • Offer Acceptance and Validity Period: 90 calendar days from the date submitted.
  • A pre-proposal site visit was strongly encouraged.

Contact Information

All questions and offer submissions must be in writing via email to Adam Graham (adam_graham@fws.gov).

People

Points of Contact

Graham, AdamPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Award Notice
Posted: Mar 19, 2026
Version 4
Solicitation
Posted: Mar 3, 2026
View
Version 3
Solicitation
Posted: Mar 2, 2026
View
Version 2
Solicitation
Posted: Feb 24, 2026
View
Version 1
Solicitation
Posted: Feb 9, 2026
View
Y--Santa Ana NWR Design Build Shade Structure | GovScope