59--SF6 CIRCUIT BREAKER OVERHAULT KIT

SOL #: 140R1726Q0024Solicitation

Overview

Buyer

Interior
Bureau Of Reclamation
GRAND COULEE POWER OFFICE
GRAND COULEE, WA, 99133, United States

Place of Performance

Place of performance not available

NAICS

Switchgear and Switchboard Apparatus Manufacturing (335313)

PSC

Circuit Breakers (5925)

Set Aside

Economically Disadvantaged WOSB (EDWOSB) Program Set-Aside (FAR 19.15) (EDWOSB)

Timeline

1
Posted
May 5, 2026
2
Last Updated
Jun 3, 2026
3
Submission Deadline
May 28, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, Bureau of Reclamation, Grand Coulee Power Office is soliciting for SF6 Circuit Breaker Overhaul Kits for ABB SF6 generator circuit breakers, model HECI-3R. This procurement is designated as an Economically Disadvantaged WOSB (EDWOSB) Program Set-Aside. However, an amendment has added a determination to solicit from a single source, Hitachi Energy, due to the proprietary nature of the required parts. Quotes are due by May 28, 2026, at 5 PM Eastern.

Scope of Work

The requirement is for one (1) Brand Name Hitachi Energy/ABB Breaker Kit to support a 15-year overhaul of a Type HECI-3/R SF6 Circuit Breaker at the Grand Coulee Dam, Grand Coulee, Washington. Key deliverables include:

  • One (1) SF6 Circuit Breaker Overhaul Kit (Type HECI-3/R).
  • A detailed list of all applicable manufacturer-generated part numbers.
  • A cut sheet or similar documentation with dimensions and drawings for technical acceptability.
  • One copy of the Operations and Maintenance Manual Repair Kit for the SF6 Gas Breaker, covering installation, operation, maintenance, repair, and troubleshooting.
  • A minimum one-year warranty on all parts. These kits are critical for the efficient and effective operation of multiple pumps and are essential for safety and reliability.

Contract & Timeline

  • Opportunity Type: Solicitation
  • Set-Aside: Economically Disadvantaged WOSB (EDWOSB) Program Set-Aside (FAR 19.15).
  • Submission Deadline: May 28, 2026, 5 PM Eastern.
  • Estimated Delivery: 20 weeks after receipt of order, with a target delivery date of December 31, 2026.
  • Published Date: May 13, 2026.

Evaluation

Award will be made to the responsible Offeror whose offer is most advantageous, based on "Price only." Price reasonableness will be determined in accordance with FAR 12.204(a).

Additional Notes

This solicitation includes Amendment 0001, which added a single source determination for Hitachi Energy, as market research confirmed only genuine Hitachi Energy brand SF6 circuit breaker parts can be used without risking damage or jeopardizing safety. Amendment 0002 extended the closing date. Offerors must acknowledge receipt of all amendments when submitting their quotes.

People

Points of Contact

Files

Files

Download
Download
Download

Versions

Version 5
Solicitation
Posted: Jun 3, 2026
View
Version 4
Solicitation
Posted: May 14, 2026
View
Version 3Viewing
Solicitation
Posted: May 13, 2026
Version 2
Solicitation
Posted: May 5, 2026
View
Version 1
Solicitation
Posted: May 5, 2026
View
59--SF6 CIRCUIT BREAKER OVERHAULT KIT | GovScope