SNRA Window & Door Replacement Project

SOL #: 1240LT26Q0050Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 8
Ogden, UT, 844012310, United States

Place of Performance

Stanley, ID

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Other Administrative Facilities And Service Buildings (Z2AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 4, 2026
2
Last Updated
May 19, 2026
3
Submission Deadline
Jun 12, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service, specifically the CSA Intermountain 8 office, is soliciting proposals for the SNRA Window & Door Replacement Project within the Sawtooth National Recreation Area in Stanley and Ketchum, Idaho. This project involves replacing windows, exterior entry doors, sliding glass patio doors, and overhead garage doors on various housing units and a warehouse building. This acquisition is a Total Small Business Set-Aside. Quotes are due by June 12, 2026, at 5 PM MT.

Scope of Work

The project requires the replacement of existing windows, exterior entry doors, sliding glass patio doors, and overhead garage doors at the North Fork Administrative site (near Ketchum, ID) and the Stanley Ranger Station Administrative site (near Stanley, ID). Specific material requirements include fiberglass-framed windows and sliding glass patio doors, fiberglass exterior entry doors, and steel overhead garage doors. The contractor must submit a site plan, limit disturbance to one building at a time, protect structures from weather, and ensure minimal inconvenience to tenants and the public. Allowable construction hours are 7:00 a.m. to 7:00 p.m., Monday through Saturday. Detailed requirements are outlined in Attachment A (Statement of Work) and Attachment C (Supplemental Specifications).

Contract Details

This is a Combined Synopsis/Solicitation for commercial items, with an anticipated award of a firm-fixed-price contract. The government intends to make one award. The period of performance requires work to commence within 14 calendar days after the notice to proceed, with completion no later than September 30, 2026. This acquisition is a Total Small Business Set-Aside under NAICS Code 236220 (Repair Or Alteration Of Other Administrative Facilities And Service Buildings) with a size standard of $45.0M. Attachment B details base bid items and two option items, along with bonding requirements.

Submission & Evaluation

Quotes (offers) are due no later than June 12, 2026, at 5 PM MT. Questions (RFIs) were due by May 21, 2026, at 5 PM MT. Offerors must hold prices for at least 90 calendar days. Evaluation will follow a Lowest Price Technically Acceptable (LPTA) approach, considering Technical Acceptability (on an Acceptable/Unacceptable basis), Price (for fairness and reasonableness), and Past Performance (Acceptable, Neutral, or Unacceptable). A site visit was scheduled for May 19, 2026, at 11 AM MT at the Stanley Ranger Station.

Key Attachments & Contacts

Bidders should review Attachment A (Statement of Work), Attachment B (Schedule of Items), Attachment C (Supplemental Specifications), and Attachment D (Drawings) for detailed project requirements. Wage determinations for Custer and Blaine Counties, Idaho (Attachments E and F), are also provided and must be adhered to for labor cost estimation. The Contract Specialist is Elliott McElroy (elliott.mcelroy@usda.gov, 202-619-7950), and the Contracting Officer Representative (COR) is Kevin Duchow (kevin.duchow@usda.gov, 208-423-7525).

People

Points of Contact

Elliott McElroyPRIMARY
Kevin DuchowSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 19, 2026
Version 1
Combined Synopsis/Solicitation
Posted: May 4, 2026