Solicitation/Synopsis for Ground Hop Kit, NSN: 2920-01-700-1933

SOL #: W912CH-25-R-0219Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC- DTA
WARREN, MI, 48397-5000, United States

Place of Performance

Place of performance not available

NAICS

Motor Vehicle Electrical and Electronic Equipment Manufacturing (336320)

PSC

Engine Electrical System Components, Nonaircraft (2920)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 25, 2026
2
Last Updated
Apr 2, 2026
3
Submission Deadline
May 11, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The United States Army Contracting Command – Detroit Arsenal (ACC-DTA) is soliciting proposals for a Ground Hop Kit (NSN: 2920-01-700-1933) under solicitation W912CH-25-R-0219. This is a Total Small Business Set-Aside for a Firm-Fixed Price (FFP) contract, including a 100% option. Proposals are due May 11, 2026.

Scope of Work

The requirement is for the procurement of 35 Ground Hop Kits (Part Number: 57K7985), with an option for an additional 100% quantity. Key aspects include:

  • Technical Data Package (TDP): Available via SAM.gov, it is EXPORT CONTROLLED (Distribution D) and requires Joint Certification Program (JCP) certification (DD Form 2345) for access.
  • Technical Requirements: Offerors must demonstrate compliance with specific Qualified Products List (QPL) requirements for Drawing 19207 57K7985, including wiring harnesses, MIL-DTL-23053, MIL-DTL-38999, and MIL-PRF-2104, as detailed in the Technical Information Questionnaire (TIQ).
  • First Article Test (FAT): A FAT is required, though a waiver worksheet is provided for contractors who may qualify for a waiver.
  • Packaging: Military Level A preservation and packaging are mandated, with detailed Special Packaging Instructions (SPIs) provided.
  • FOB Point: Destination (updated by Amendment 0002).

Contract & Timeline

  • Contract Type: Firm-Fixed Price (FFP)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 336320 (Motor Vehicle Electrical and Electronic Equipment Manufacturing)
  • Delivery: 270 Days After Contract (DAC) or FAT Approval, whichever is later.
  • Proposal Due: May 11, 2026, at 04:00 PM local time (extended by Amendment 0001).
  • Questions Due: April 17, 2026, at 12:00 PM EST (extended by Amendment 0001).
  • Published: April 1, 2026.

Submission & Evaluation

  • Submission Method: Proposals must be submitted electronically via email to Contract Specialist Zachary Wiegand (zachary.k.wiegand.civ@army.mil).
  • Evaluation Criteria: Lowest Price Technically Acceptable (LPTA).
    • Technical Factor: Evaluated as Acceptable/Unacceptable based on the Technical Information Questionnaire (TIQ) and substantiating documentation.
    • Price Factor: Evaluated for reasonableness using the provided Price Evaluation Spreadsheet.
  • Eligibility: Offerors must be registered in SAM.gov and self-certified to NAICS code 336320.
  • Award Policy: "All or None" award policy is in effect.

Additional Notes

Offerors are responsible for monitoring SAM.gov for any further amendments. The Government is unable to maintain a mailing list.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: Apr 2, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Apr 1, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Mar 27, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View
Version 1
Solicitation
Posted: Mar 25, 2026
View