Synopsis for Overhaul of CH-47 Control Assembly, Quadrant

SOL #: W58RGZ-26-B-0019Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-RSA
REDSTONE ARSENAL, AL, 35898-0000, United States

Place of Performance

Redstone Arsenal, AL

NAICS

Aircraft Manufacturing (336411)

PSC

Miscellaneous Aircraft Accessories And Components (1680)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 2, 2026
2
Last Updated
Mar 17, 2026
3
Response Deadline
Apr 1, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army (ACC-RSA) has issued a presolicitation for the overhaul of CH-47 Control Assembly, Quadrant (NSN 1680-01-549-4959). This is a 100% Small Business Set-Aside for a five-year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract. The overhaul is crucial for the sustainment and operational readiness of the CH-47 fleet. An RFP will be issued at a later date.

Scope of Work

The contractor will be responsible for furnishing all necessary services, facilities, labor, parts, materials, equipment, tools, and data to accomplish the inspection and overhaul of the CH-47 Control Assembly, Quadrant.

  • Nomenclature: CH-47 Control Assembly, Quadrant
  • NSN: 1680-01-549-4959
  • P/N: 145ES010-8
  • Estimated Quantity: Minimum 9 each – Maximum 54 each (including 9 for Foreign Military Sales).
  • The overhaul must restore unserviceable assets to a like-new, fully serviceable, and air-worthy condition, adhering to specifications in Depot Maintenance Work Requirement (DMWR) 1-1680-391, Revision 7/21/2017, Change # 0.
  • The item is not a Critical Safety Item (CSI).

Contract & Timeline

  • Contract Type: Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) overhaul contract.
  • Duration: Five (5) years.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Synopsis Published: March 17, 2026.
  • Synopsis Closing Date: April 1, 2026 (estimated, dependent on RFP release).
  • RFP Release: To be issued at a later date.
  • Funding: Requirement is currently unfunded; award is contingent upon receipt of sufficient funds.

Response Information

This is a presolicitation notice. An RFP will be issued subsequently. No reimbursement will be made for costs associated with providing information in response to this announcement. All responsible sources may submit an offer once the RFP is released. Foreign firms must process requests through their respective embassies.

Point of Contact

People

Points of Contact

Cameron MaclinPRIMARY
Charles R. MillerSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 2Viewing
Pre-Solicitation
Posted: Mar 17, 2026
Version 1
Sources Sought
Posted: Mar 2, 2026
View
Synopsis for Overhaul of CH-47 Control Assembly, Quadrant | GovScope