SPRING,FLAT

SOL #: N0010425QXE32Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP WEAPON SYSTEMS SUPPORT MECH
MECHANICSBURG, PA, 17050-0788, United States

Place of Performance

Place of performance not available

NAICS

Spring Manufacturing (332613)

PSC

Coil, Flat, Leaf, And Wire Springs (5360)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 24, 2026
2
Last Updated
Apr 24, 2026
3
Submission Deadline
Jun 1, 2026, 8:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, specifically NAVSUP WEAPON SYSTEMS SUPPORT MECH, is seeking competitive quotes for the manufacture of SPRING,FLAT (Product Service Code 5360). This is a competitive Navy spare requirement and not a small business set-aside. The solicitation is currently closed due to a delay in uploading drawings but will be reopened when they become available. Interested vendors should monitor SAM.gov for updates. The response date, once reopened, is June 1, 2026, by 5:00 PM Eastern.

Scope of Work

This opportunity requires the manufacture of SPRING,FLAT in accordance with specified requirements, including DRAWING DATA=5762142 and MIL-DTL-19595. Key aspects include:

  • Adherence to Cage Code/Reference Number Items: 53711 5762142.
  • Marking in accordance with MIL-STD-130, REV N.
  • Production Lot Testing (100% inspection): All units must be delivered to NAVAL SURFACE WARFARE CENTER INDIAN HEAD EXPLOSIVE ORDNANCE DISPOSAL TECHNOLOGY DIVISION for testing. The EOD Technician has 90 days for testing/inspection/acceptance, with an additional 30 days for notification (total 120 days).
  • First Article Testing: Five units must be delivered to NSWC Indian Head EOD Technology Center for testing, with the government having 90 days for testing and inspection.
  • Packaging must comply with MIL-STD 2073.
  • Material Certificates of Conformance (C of Cs) are required for all First Article and Production Lot Testing materials.
  • No Non-Magnetic Testing is required for this specific material.

Contract & Timeline

  • Type: Solicitation (Competitive Navy Spare Requirement)
  • Set-Aside: None (Not a small business set-aside)
  • Current Status: Closed, pending drawing upload. Will reopen.
  • Response Date (once reopened): June 1, 2026, 5:00 PM Eastern
  • Published Date: April 24, 2026

Evaluation Factors

Award will be made to the responsible offeror whose quotation provides the best value to the Government, considering both price and non-price factors in order of relative importance:

  1. Price
  2. Past Performance: Evaluated for successful performance, quality, timeliness, cost management, communication, and customer satisfaction.
  3. Supplier Performance Risk: As described in DFARS 252.204-7024.

Submission Requirements

Quotes, including shipping costs (FOB destination), shall be emailed to tyler.l.curfman.civ@us.navy.mil. Vendors must provide proof of being an authorized distributor of the original manufacturer's item on company letterhead with their offer. Requests for variance (Waiver/Deviation) must be submitted via DD form 1694 through NAVSUP's Contracting Officer.

People

Points of Contact

BRIAN J. CAWLEY, N774.7, EMAIL BRIAN.J.CAWLEY2.CIV@US.NAVY.MILPRIMARY

Files

Files

View
View

Versions

Version 2Viewing
Solicitation
Posted: Apr 24, 2026
Version 1
Solicitation
Posted: Apr 24, 2026
View
SPRING,FLAT | GovScope