Station Chetco River Replacement Flooring

SOL #: 70Z03326QSEAT0008Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
BASE SEATTLE(00033)
SEATTLE, WA, 98134, United States

Place of Performance

OR

NAICS

Flooring Contractors (238330)

PSC

Repair Or Alteration Of Other Administrative Facilities And Service Buildings (Z2AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 29, 2026
2
Submission Deadline
Jul 6, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard (USCG), under the Department of Homeland Security, is soliciting quotations for Station Chetco River Replacement Flooring services. This opportunity requires the removal of existing locker room flooring and the installation of approximately 775 square feet of new Roppe Rubber Tile (or equal) and Roppe Vinyl Wall Base (or equal) at USCG Station Chetco River in Brookings, OR. This acquisition is a Total Small Business Set-Aside.

Scope of Work

The contractor shall provide all labor, materials, equipment, and supervision to remove existing locker room flooring and install new, durable, non-slip flooring in both male and female locker rooms. The new flooring must be Roppe Rubber Tile, Raised Design, #992 Low Profile Circular Tile (Dark Gray, or equal), and Roppe 1/8" Vinyl Wall Base (4" height, Dark Gray, or equal). Key requirements include:

  • Removal of approximately 775 sq ft of existing flooring and cove baseboard.
  • Substrate preparation, including cleaning, crack repair, priming, and self-leveling compound application.
  • Installation of new PVC-free, FloorScore® Certified rubber tile and vinyl wall base meeting ASTM standards for slip resistance, chemical resistance, and durability.
  • Disposal of all removed materials in accordance with local regulations.
  • Minimizing disruption to daily operations.
  • Providing a 5-year limited warranty for the rubber tile and a 3-year limited commercial warranty for the vinyl wall base.

Contract Details

  • Contract Type: Request for Quotations (RFQ), Firm-Fixed Price.
  • Set-Aside: Total Small Business.
  • NAICS Code: 238330 (Flooring Contractors), Size Standard: $19.0M.
  • PSC Code: Z2AZ (Repair or Alteration of Other Administrative Facilities and Service Buildings).
  • Period of Performance: Work must be completed within 90 days after the Notice to Proceed (NTP), with a projected completion date on or before October 13, 2026.
  • Place of Performance: U.S. Coast Guard, Station Chetco River, 16133 Boat Basin Road, Brookings, OR 97415.

Key Dates & Actions

  • Mandatory Site Visit: June 22, 2026, at 0900 PST. RSVP to Ava Stow (ava.m.stow@uscg.mil) by June 18, 2026. Failure to attend renders proposals non-responsive.
  • Questions Due: June 29, 2026, submitted in writing to ava.m.stow@uscg.mil with RFQ number 70Z03326QSEAT0008 in the subject line.
  • Quotes Due: July 6, 2026, by 0700 PST.

Submission Requirements

Quotes must be submitted electronically to Ava.M.Stow@uscg.mil with the solicitation RFQ number 70Z03326QSEAT0008 in the subject line. A complete submission includes:

  • Part 1: Price Quotation:
    • Completed and signed Standard Form (SF) 1442.
    • Detailed Price Breakdown covering Mobilization & Site Prep, Itemized Materials, Installation by Tasks, and Labor Rate.
  • Part 2: Technical Proposal:
    • A clear, concise narrative (without pricing) demonstrating understanding of the SOW.
    • Technical Approach detailing mobilization, demolition/removal, substrate prep, installation, and cleanup.
    • Project Schedule with planned start, major milestones, and completion date (on or before October 13, 2026).

Evaluation Criteria

The Government will evaluate the Technical Proposal on an Acceptable/Unacceptable basis. Award will be made to the lowest priced, responsible quoter whose quote conforms to all solicitation requirements and is rated 'Acceptable' technically. Offerors must be registered in the System for Award Management (SAM) prior to award.

Contact Information

For inquiries and submissions, contact Ava Stow at ava.m.stow@uscg.mil.

People

Points of Contact

Ava StowPRIMARY
Michelle MyhraSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 29, 2026
Station Chetco River Replacement Flooring | GovScope