Steam Boiler Rebuilds

SOL #: W912EE26QA025Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W07V ENDIST VICKSBURG
VICKSBURG, MS, 39183-3435, United States

Place of Performance

Vicksburg, MS

NAICS

Power Boiler and Heat Exchanger Manufacturing (332410)

PSC

Marine Hardware And Hull Items (2040)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 3, 2026
2
Submission Deadline
Jun 17, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers, Vicksburg District, is soliciting quotes for Steam Boiler Rebuilds on Quarterboat 9901. This is a 100% Small Business Set-Aside for a Firm-Fixed Price contract. The procurement falls under NAICS code 332410 (Power Boiler and Heat Exchanger Manufacturing) with a 750-employee size standard. Quotes are due June 17, 2026, by 5:00 PM ET.

Purpose & Scope

The Revetment Branch requires a contractor to perform comprehensive rebuilds of two Hurst S350-150-18/19 steam boilers and two Gordon Piatt S10-0-15 burners on Quarterboat 9901. The work includes:

  • Replacement of main control and power units with PowerFlame units.
  • Replacement of low water alarm systems, probes, safety switches, valves, and pressure control components.
  • Replacement of door pins, bolts, clips, insulation rope, and door insulation.
  • Replacement of main blow down valve controls and the main hot well system (water tank, motor/pump combinations, controls).
  • Installation of a new main line blowdown/drier system to reduce condensation.
  • Installation of new E-stop switches and CO2 monitors.
  • Complete cleaning of the stack system.
  • Provision and installation of a stainless steel collection tank with duplex discharge pumps.
  • Initial system chemical treatment, hands-on training for operations and safety, and provision of a standard operating procedure guide and chemical/material list with SDS. All work must be completed in accordance with the Statement of Work (SOW) no later than September 11, 2026, at the USACE Vicksburg harbor, Mat Sinking Unit, 2577 Haining Rd, Vicksburg, MS, 39183.

Contract Details

  • Solicitation Number: W912EE26QA025
  • Type: Firm-Fixed Price Contract
  • Set-Aside: 100% Small Business Set-Aside
  • Period of Performance: All requirements to be completed by September 11, 2026.
  • Warranty: A minimum one-year parts and labor warranty is required on all components.
  • Security: Contractors must comply with general security requirements, including personnel vetting through E-Verify, installation access procedures, and Suspicious Activity Reporting training. Government approval is required for non-U.S. citizens working on the contract.

Evaluation & Award

Award will be made to the responsible Offeror whose offer is most advantageous to the Government, considering price and other factors. The evaluation will be based on:

  • Factor 1: Technical Capability (Successful / Unsuccessful), encompassing:
    • Subfactor A: Technical Approach and Compliance (detailed plan for all specified replacements, installations, cleaning, assembly).
    • Subfactor B: Personnel Qualifications & Security (experience for key personnel in Scotch marine boilers, compliance with security).
    • Subfactor C: Training Plan (detailed hands-on training plan).
    • Subfactor D: Warranty & Inspection (provision of one-year warranty, arranging state inspection).
  • Factor 2: Price (total quoted price, reasonableness, comparison to Government estimates). Award will be made to the contractor whose price is the lowest among all offers determined technically "Successful." The Government intends to award without discussions but reserves the right to hold them. Offerors are encouraged to provide their best proposed pricing in their initial offer. All offers must be valid for 60 days.

Submission Requirements & Deadlines

  • Quotes Due: June 17, 2026, by 5:00 PM ET.
  • Submission Method: Electronically via email to Alexandria.E.Long@usace.army.mil.
  • Required Content: The Bidding Schedule must be returned with the quote. Quotes must include specified content; failure to do so may result in rejection.
  • Technical Questions: Submit via ProjNet (https://www.projnet.org) using Bidder Inquiry Key: EJQSME-26U2PV. Questions submitted within 72 hours of the closing date are not guaranteed a response.
  • Offerors are responsible for reviewing all solicitation information and checking SAM.gov for modifications.

People

Points of Contact

Dustin G. CannadaSECONDARY

Files

Files

Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Jun 3, 2026
Steam Boiler Rebuilds | GovScope