STEEL TOWER ROAD CULVERT REPAIR

SOL #: N4008526R9032Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Highway (237310)

PSC

Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways (Z2LB)

Set Aside

Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13) (HZC)

Timeline

1
Posted
Apr 28, 2026
2
Last Updated
May 26, 2026
3
Submission Deadline
May 28, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVFACSYSCOM MID-ATLANTIC is soliciting proposals for the STEEL TOWER ROAD CULVERT REPAIR project at Camp Lejeune, NC. This is a Historically Underutilized Business (HUBZone) Set-Aside opportunity, with an estimated cost range of $100,000 to $250,000. Proposals are due May 28, 2026, at 2:00 PM EST.

Scope of Work

This project involves the removal and replacement of an existing 48-inch culvert and headwalls with a new double barrel 48-inch culvert (consisting of two 48-foot runs of 48-inch Reinforced Concrete Pipe (RCP)) and new precast concrete headwalls at the Verona Loop Training Area on Steel Tower Road. Key tasks include:

  • Demolition of approximately 1000 square feet of 18-inch thick concrete roadway.
  • Removal of existing 48-inch corrugated metal pipe and rip-rap.
  • Installation of 96 linear feet of new 48-inch RCP and NCDOT-compliant concrete headwalls.
  • Backfilling with stabilized rip-rap, geotextile, and Aggregate Base Course (ABC) compacted to 95% density.
  • Seeding and permanent vegetative cover for disturbed areas.
  • De-watering of the stream section for concrete work.

Operations must minimize interference with ongoing facility activities, and the road will be closed during construction. One person may fulfill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer if qualified. The new concrete roadway will not receive steel reinforcement.

Contract & Timeline

  • Contract Type: Combined Synopsis/Solicitation
  • Set-Aside: Historically Underutilized Business (HUBZone)
  • Product Service Code: Z2LB (Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways)
  • Contract Completion: 240 days after award.
  • Liquidated Damages: Do not apply (per Amendment 0003).
  • Proposal Acceptance Period: 60 days from receipt of offers.
  • Buy American Requirement-Construction Materials applies.

Submission & Evaluation

  • Proposal Due Date: May 28, 2026, 2:00 PM EST.
  • Submission Method: Email proposals to brandi.l.porche.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil.
  • Basis for Award: Lowest Price.
  • Bond Requirements: Bid bonds for proposals $35K+, payment/performance bonds for $150K+.
  • RFIs Cut-off: May 13, 2026, 2:00 PM EST.
  • Eligibility: This solicitation is restricted to specific Civil/Paving MACC Contractors: Quadrant Construction, Inc., Riza Construction, Inc., and Civil Works Contracting, LLC.

Additional Notes

Offerors must acknowledge all amendments when submitting their proposal. Funding may not be available, and no award will be made if funds are not secured, with no reimbursement for proposal costs. A site visit was held on May 5, 2026. Contractors must comply with the Contractor Environmental Guide and extensive submittal requirements.

People

Points of Contact

Brandi PorchePRIMARY
Lauren LocontoSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: May 26, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: May 21, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: May 14, 2026
Version 4
Combined Synopsis/Solicitation
Posted: May 6, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
STEEL TOWER ROAD CULVERT REPAIR | GovScope