Stoplog Painting and Refurbishment

SOL #: 6923G526Q0038Combined Synopsis/Solicitation

Overview

Buyer

Transportation
Great Lakes St Lawrence Seaway Development Corporation
6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.
MASSENA, NY, 13662, United States

Place of Performance

Massena, NY

NAICS

Painting and Wall Covering Contractors (238320)

PSC

Maintenance Of Other Non Building Facilities (Z1PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 21, 2026
2
Last Updated
May 18, 2026
3
Submission Deadline
May 22, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Great Lakes St. Lawrence Seaway Development Corporation (GLS), under the Department of Transportation, is seeking a contractor for Stoplog Painting and Refurbishment at Snell Lock in Massena, NY. This is a Total Small Business Set-Aside opportunity, issued as a Request for Quote (RFQ) for commercial services. The work involves painting and mechanical refurbishment of eight steel stoplogs. Quotes are due by May 22, 2026, at 2:00 PM EST.

Scope of Work

The contractor will perform painting and mechanical refurbishment of eight (8) steel stoplogs (two Type A, three Type B, three Type C) at Snell Lock. Tasks include blasting, painting, minor structural steel weld repairs, and the removal and replacement of all stoplog rollers, rubber seals, and hardware. Existing coatings are assumed to contain lead-based paint (LBP), requiring specific waste management. A new vinyl type Zinc Rich Coating will be applied to SSPC-SP 5 White Metal Blast standard. GLS will remove stoplogs from the pit for contractor work.

Contract Details

  • Contract Type: Firm Fixed Price
  • Period of Performance: Begin within 10 calendar days and complete within 120 calendar days after notice to proceed.
  • Place of Performance: Snell Lock, Massena, NY 13662.
  • NAICS Code: 238320 – Painting and Wall Covering Contractors (Small Business Size Standard: $19.0M)
  • Set-Aside: Total Small Business Set-Aside

Submission & Evaluation

Quotes will be evaluated using a Lowest Price Technically Acceptable (LPTA) approach. Quoters must be registered and have an active registration in SAM.gov at the time of solicitation closing and award. Required submissions include a technical response (limited to 15 pages, demonstrating ability to meet PWS requirements and including a project plan), past performance references (minimum two, maximum three from the last five years), and pricing on Attachment B – Pricing Sheet. Contractor personnel will require background investigations.

Special Requirements

Contractor must be AMPP QP1 and QP2 certified. An independent, third-party Certified Industrial Hygienist (CIH) or EPA-certified Lead Project Designer/Supervisor is required, along with an AMPP C-3 qualified Lead Removal Supervisor on-site during lead handling. An AMPP CIP Level 2 certified paint inspector is also required. The coating applicator must have documented experience with USACE vinyl coating systems. Detailed project plans (schedule, work plan, waste management, etc.) are mandatory.

Key Dates & Contacts

  • Site Visit: May 06, 2026, 10:00 AM EST at Eisenhower Lock Overlook (North), Massena, NY. Confirm attendance by May 05, 2026, 2:00 PM EST.
  • Questions Due: May 08, 2026, 2:00 PM EST.
  • Quotes Due: May 22, 2026, 2:00 PM EST.
  • Contact: Chora Snyder (chora.snyder@dot.gov, 315-764-3206).

People

Points of Contact

Chora SnyderPRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 3
Combined Synopsis/Solicitation
Posted: May 18, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 4, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
View