Z--SUCR SECONDARY SEWER LINE INSTALLATION

SOL #: 140P1526Q0049Solicitation

Overview

Buyer

Interior
National Park Service
IMR ARIZONA(12400)
FLAGSTAFF, AZ, 86001, United States

Place of Performance

Flagstaff, AZ

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Maintenance Of Sewage And Waste Facilities (Z1ND)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 18, 2026
2
Last Updated
Apr 1, 2026
3
Submission Deadline
Apr 16, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), under the Department of the Interior, is soliciting proposals for the installation of a secondary sewer line at Sunset Crater Volcano National Monument (SUCR) in Flagstaff, AZ. This construction contract is a 100% Total Small Business Set-Aside and aims to service 10 Recreational Vehicle (RV) spots. Proposals are due April 16, 2026, by 12:00 PM local time.

Scope of Work

The project requires the installation of a new secondary sewer line to service 10 RV sites. Key tasks include:

  • Constructing a new sanitary sewer main and services for RV sites.
  • Constructing a cleanout for the existing apartment building sanitary sewer service.
  • Abandoning the existing sanitary sewer for the RV sites.
  • Performing asphalt and surfacing removal/replacement.
  • Raising a water main where it crosses the new sewer main. All work must be completed by skilled personnel according to industry standards and manufacturer specifications.

Contract & Timeline

  • Contract Type: Firm Fixed Price construction contract.
  • Period of Performance: 90 calendar days after receipt of Notice to Proceed.
  • Estimated Magnitude: Between $25,000.00 and $100,000.00.
  • Set-Aside: 100% Total Small Business Set-Aside.
  • Site Visit: Scheduled for Tuesday, March 24, 2026, at 9:00 AM Mountain Standard Time at the Visitor Center Parking Lot, SUCR.
  • Questions Due: Three (3) days after the site visit. Government responses will be posted as an amendment.
  • Proposal Due: April 16, 2026, by 12:00 PM local time.

Submission & Evaluation

  • Submission: All quotes must be submitted electronically in PDF format to lindsay_mclaughlin@ios.doi.gov.
  • Payment Bond: Required for offers over $35,000.00, due within ten (10) days of award.
  • Evaluation: Quotations will be evaluated impartially, considering those with the highest perceived value based on price, technical capability, and prior experience.
  • Amendment Acknowledgment: Offerors must acknowledge Amendment 0001 with their quote package.

Additional Notes

Offerors must be registered in SAM.gov with an "active" status. Quotes must be valid for a minimum of 60 days. Award is subject to the availability of funds. Amendment 0001 provides Government responses to questions and an additional document.

People

Points of Contact

McLaughlin, LindsayPRIMARY

Files

Files

Download
Download

Versions

Version 2Viewing
Solicitation
Posted: Apr 1, 2026
Version 1
Solicitation
Posted: Mar 18, 2026
View
Z--SUCR SECONDARY SEWER LINE INSTALLATION | GovScope