Switchboard and Motor Control Center (MCC) Panel Replacement Service

SOL #: W91QF526QA004Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QM MICC FT LEE
FORT LEE, VA, 23801, United States

Place of Performance

Radford, VA

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Mechanical Power Transmission Equipment (J030)

Set Aside

No set aside specified

Timeline

1
Posted
May 7, 2026
2
Response Deadline
May 21, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army is conducting market research through a Sources Sought Notice to identify qualified firms for Switchboard and Motor Control Center (MCC) Panel Replacement Service at the ALTESS Data Center, Radford Army Ammunition Plant, Radford, VA. This effort involves the removal of existing GE and Westinghouse panels and the installation of new Eaton (or equal) systems. Responses are due by May 21, 2026, at 12:00 PM EST.

Scope of Work

The contractor will provide comprehensive services including the removal of one (1) Westinghouse switchboard/MCC panel in Room 241 and one (1) GE switchboard/MCC panel in Room 119. New customized Eaton (or equal) switchboards and MCC panels will be installed in both rooms. Key tasks involve:

  • Equipment Removal & Installation: Disconnecting and temporarily powering critical equipment (hot water pumps, sewer ejection compressors) during panel replacement.
  • Circuit Rerouting & Integration: Rerouting feeder circuits, control wiring, and ensuring seamless integration with existing Trane Building Automation System (BAS) and Schneider Electric StruxureWare monitoring systems. A certified Trane Authorized Controls technician is required for BAS verification and recommissioning.
  • Power Distribution: Refeeding new MCCs from existing breakers and rerouting lighting panel feeds. Repowering of panels must occur after hours or on weekends.
  • Studies & Disposal: Providing an arc flash, short circuit, and coordination study for the entire ALTESS facility. All old equipment and debris must be removed and disposed of at an approved offsite facility.

Contract & Timeline

  • Type: Sources Sought / Request for Information (RFI)
  • Anticipated Period of Performance: July 1, 2026 – June 30, 2027
  • Set-Aside: None specified (market research to identify various small business types)
  • NAICS Code: 238210 - Electrical Contractors
  • Response Due: Thursday, May 21, 2026, at 12:00 PM EST
  • Published: May 7, 2026

Capability Statement Requirements

Interested parties must submit a Capability Statement (max 10 pages) addressing:

  • Company Profile: Name, Address, CAGE Code, UEI.
  • Point of Contact: Name, Title, Phone, Email.
  • Business Size & Socio-Economic Status: Under NAICS 238210 (e.g., 8(a), SDVOSB, WOSB, HUBZone).
  • Technical Capability: Demonstrated ability to provide, install, and customize Eaton (or equal) switchboards/MCCs, including the ability to provide a certified Trane Authorized Controls technician and integrate with Schneider Electric StruxureWare.
  • Logistics & Security: Ability to perform after-hours/weekend work and comply with Radford Army Ammunition Plant (RFAAP) security requirements.
  • Past Performance: Up to three (3) similar projects within the last five (5) years involving data center power infrastructure replacement, BAS integration, and secure facility operations.

Submission Instructions

Additional Notes

This is for market research and planning purposes only and does not constitute a solicitation or commitment to issue a contract. Proprietary information should be clearly marked.

People

Points of Contact

Heather B. JarrattSECONDARY

Files

Files

Download
Download

Versions

Version 1Viewing
Sources Sought
Posted: May 7, 2026
Switchboard and Motor Control Center (MCC) Panel Replacement Service | GovScope