Tankers System Support Program Office (SPO) Information Assurance (IA), Mission Assurance (MA), Aerospace Systems (AS), Aerospace Engineering (AE), and Information/Mission Systems Security Improvements (IA/MA/AS/AE)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The General Services Administration (GSA), on behalf of the Air Force Life Cycle Management Center (AFLCMC), is conducting a Sources Sought / Request for Information (RFI) for the Tankers System Support Program Office (SPO). This RFI seeks information on vendor capabilities to provide Information Assurance (IA), Mission Assurance (MA), Aerospace Systems (AS), Aerospace Engineering (AE), and Information/Mission Systems Security Improvements (IA/MA/AS/AE). Responses are due by April 20, 2026, at 5:00 p.m. EDT.
Purpose
This is a market research effort to identify qualified vendors for potential future procurement. It is not a Request for Proposal (RFP), and no award will result from this RFI. The government will use the information to determine the best method of procurement.
Scope of Work
The effort involves providing personnel continuity for weapon system maintenance, operation, modifications, and mission assurance activities across various Defense Acquisition Life Cycle phases. Key support areas include:
- Information Assurance (IA) and Mission Assurance (MA)
- Aerospace Systems (AS) and Aerospace Engineering (AE)
- Lifecycle Management Process Integrated Data Environment (LCMP-IDE) System Administration
- Reviewing technical documents, participating in working groups (RWG, RRB, SWG)
- Developing modification training materials, and conducting test and evaluations.
Key Functional Areas & Expertise Required
- Task Order Program Management Services
- Requirements Definition
- Acquisition, Maintenance & Operation, and Logistics Programs
- Test and Evaluation Planning and Execution
- Lifecycle Management Process - Integrated Data Environment (LCMP-IDE)
- Digital Material Management
- Systems Engineering Analysis, Risk Management, Spectrum Management
- Cybersecurity and Information Assurance
- Logistics Data Analysis
Contract & Timeline
- Type: Sources Sought / Request for Information (RFI)
- Set-Aside: None specified (responses requested from all business sizes)
- Response Due: April 20, 2026, 5:00 p.m. EDT
- Published: April 7, 2026
- Place of Performance: S Coffeyville, OK (as per metadata, though PWS excerpt does not explicitly state)
Submission Requirements
Interested vendors must submit:
- A complete Sources Sought Response Form-Tankers SPO (attached to the RFI).
- The response form requires company information (CAGE, business size, socio-economic status), clearance information (Secret Facility Clearance), project-specific expertise, and at least 3 past experience references within the last 5 years with similar scope. It also includes specific RFI questions regarding cloud-based lifecycle management, data integration, analytics, personnel clearances, AWS GovCloud experience, and software development/testing infrastructure.
Contact Information
- Primary: Jerry E. McTyre (jerry.mctyre@gsa.gov)
- Secondary: Alex Budai (alex.budai@gsa.gov)
Additional Notes
Failure to provide timely information may result in the government continuing its acquisition planning without considering non-responsive contractors. This RFI is for information purposes only and does not constitute a quote or proposal.