Temporary AC for B185
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, specifically the 402 Commodities Maintenance Group (CMXG) at Robins Air Force Base (AFB), GA, is soliciting proposals for the lease of a 40-ton AC unit for Building 185 (B185) to support the Conformal Fuel Tank (CFT) shop. This is an Unrestricted Solicitation (FA857126Q0050). Proposals are due March 19, 2026, at 3:00 PM EST.
Scope of Work
The contractor shall provide all labor, materials, transportation, and oversight for the lease, installation, and uninstallation of a 40-ton AC unit. The unit must maintain 70°F (+/- 5°F) and 50% relative humidity, utilize 100% outside air, provide approximately 16,000 CFM airflow, and operate on 460 Volt/3 Phase/60 Hertz. It must sufficiently cool a 7500 sq ft area with 25'-34' ceiling heights. The contractor is responsible for providing a trailer/platform for unit placement on a sloped grass surface, ensuring leveling and stability, and all necessary accessories including ductwork, cabling, and electrical whips. Installation is required within two weeks of contract award. Maintenance includes HVAC technician dispatch within one hour of notification, unit replacement within 24 hours if unrepairable, and one preventative maintenance visit.
Contract & Timeline
- Opportunity Type: Solicitation
- Notice ID: 3883b2ba3e11494eae57f58b4cc3ab1b
- Product/Service Code: W041 (Lease Or Rental Of Equipment: Refrigeration, Air Conditioning, And Air Circulating Equipment)
- Place of Performance: Building 185, Robins AFB, Warner Robins, GA 31098
- Period of Performance: April 1, 2026, to October 31, 2026 (7 months)
- Set-Aside: Unrestricted
- Published Date: March 17, 2026
- Site Visit: Held March 10, 2026. Q&A from the site visit has been posted.
- Q&A Submission Deadline: March 16, 2026 (end of day)
- Response Due: March 19, 2026, 3:00 PM EST
Evaluation
Award will be made to the responsible offeror whose offer, conforming to the solicitation, is the lowest price, technically acceptable.
Special Requirements & Notes
- Mandatory Training: All contractor personnel must complete initial Environmental Management System (EMS) Awareness Training and ISO 50001 Energy Management System (EnMS) Training provided by the Air Force before starting work. Failure to document completion may result in contract termination.
- Deliverables (CDRLs): Include Status Reports (EMS & EnMS), a Contractor's Safety Plan (due within 10 working days post-award), and Accident/Incident Reports (telephonic notification within 4 hours, electronic within 3 calendar days).
- Site Conditions: Due to site conditions, the PWS has been updated, and pictures of the site (e.g., sloped grass area) are incorporated. The electrical tie-in will be to an existing 100A breaker.
- Contact: Primary point of contact is Elizabeth Haines (elizabeth.haines.2@us.af.mil, 7303267477).