TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, through AFSC PZIOC, is soliciting proposals for the replacement of switchgear in Building 1 at Tinker Air Force Base, Oklahoma. This opportunity, designated WWYK200051, is a Total Small Business Set-Aside and is restricted to MAC BOA Holder General Contractors who attended the mandatory site visit on May 14, 2026. The project involves replacing existing 280V and 208V substations with new 480V and 208V switchgears. Proposals are due by June 12, 2026.
Scope of Work
The project requires furnishing all materials, labor, tools, transportation, equipment, testing services, quality control, and incidentals to replace the 3000amp 208Volt switchgear in the center of Building 1. This includes replacing existing 280V and 208V substations with 480V and 208V switchgears, ensuring a complete and fully operating system. The scope encompasses site investigation, necessary logistical, architectural, and structural work, and adherence to extensive technical specifications and drawings.
Contract Details & Eligibility
- Contract Type: Firm Fixed Price
- Estimated Magnitude: Between $100,000 and $250,000
- Period of Performance: 180 calendar days from Notice to Proceed
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 236220 (Commercial and Institutional Building Construction) with a $45,000,000 annual receipts size standard.
- Eligibility: Strictly limited to Tinker AFB MAC BOA Holder General Contractors who attended the mandatory site visit on May 14, 2026.
- Location: Tinker Air Force Base, S Coffeyville, OK 73145.
- Funding: Obligation is contingent upon the availability of appropriated funds.
- Bonds: Performance and Payment Bonds are required within 10 calendar days after award. A bid guarantee (20% of bid price or $500,344.09, whichever is less) is also required.
Submission & Evaluation
Proposals must be submitted by June 12, 2026, at 12:00 PM local time. Offers must remain valid for at least 120 calendar days. Evaluation will follow a Lowest Priced Technically Acceptable (LPTA) source selection process. Technical proposals will be rated "Acceptable" or "Unacceptable" based on:
- Capability and Management: Assessing commitment to an on-site management team, subcontractor management, warranty support, and unforeseen conditions.
- Schedule and Planning: Evaluating the ability to meet or improve the completion date with minimal disruption, including a realistic construction schedule. Price proposals will be evaluated for reasonableness, balance, and realism. Non-compliance with instructions, including the bid guarantee, may lead to ineligibility.
Key Requirements & Documentation
Bidders must adhere to comprehensive requirements outlined in various documents, including:
- Specifications: Detailed "Issued for Construction Specifications" (WWYK200051_TAFB IFC_FINAL_SPECIFICATIONS.pdf) covering electrical, concrete, metals, demolition, and general requirements.
- Quality Control: Establishment of a robust QC system, including a QC Plan, DQC Plan, and specific personnel qualifications (01 45 00.00 10.pdf).
- Safety & Environmental: Strict adherence to general safety requirements (00 71 00.pdf), environmental regulations (00 72 00.pdf), and special provisions for working on or near the airfield (00 80 00.pdf, 00 80 05.pdf).
- Scheduling: Submission of detailed construction progress schedules using Microsoft Project (01 32 16.00 20.pdf).
- Submittals: Management of a comprehensive submittal register, including material approval via AF Form 3000 (01 33 00.pdf, Submittal Register.pdf).
- Drawings: Extensive electrical, architectural, and mechanical drawings, including "As-Built" plans, are provided for reference.
- Wage Determinations: Compliance with prevailing wage rates for Oklahoma County (WWYK200051 WAGE Determinations.pdf).
- Closeout: Requirements for closeout submittals, record drawings, and Operation and Maintenance (O&M) manuals (01 78 00.pdf, 01 78 23.pdf).
Important Notes
Contractors experiencing technical issues accessing IFC Specifications must notify the Contracting Specialist immediately. The government reserves the right to award without discussions.