Tinker AFB MAC BOA - WWYK240176 - REPLACE INDUSTRIAL WASTE LIFT STATIONS 6N & 6S, B62501

SOL #: FA813726R0012Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8137 AFSC PZIOC
TINKER AFB, OK, 73145-9125, United States

Place of Performance

S Coffeyville, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Waste Treatment And Storage Facilities (Z2PD)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 17, 2026
2
Last Updated
Apr 3, 2026
3
Submission Deadline
May 4, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the replacement of Industrial Waste Lift Stations 6N & 6S (B62501) at Tinker Air Force Base, Oklahoma. This project, designated WWYK240176, is a 100% Small Business Set-Aside and is open only to Tinker AFB MAC BOA holders. The work involves comprehensive design/engineering services and construction to replace or rehabilitate the existing lift stations, potentially combining them into a single unit. Proposals are due May 4, 2026, at 1:00 PM CST.

Project Scope

The project requires furnishing all design/engineering services, materials, labor, plant, tools, transportation, equipment, testing, quality control, and incidentals to demolish and replace industrial waste lift stations 6N and 6S. Key considerations include:

  • Rehabilitating or replacing LS-6N & 6S, potentially combining them into a single lift station.
  • Considering future flows and the rehabilitation/reuse of the wet well structure.
  • Performing a site investigation to verify existing conditions.
  • Rerouting existing gravity drains to IWLS 6S to IWLS 6N.
  • Providing a complete, operating system, including a new meter vault.

Key Requirements & Deliverables

  • Design Phases: Contractor must prepare complete designs, including preliminary (35%), intermediate (65%), pre-final (95%), and final (100%) submissions.
  • Personnel: Key personnel (Project Manager, Design Project Manager, Quality Control Manager, Site Safety and Health Officer, Project Superintendent) with specific experience are required. All personnel need AFMC Form 387 identification badges for base access.
  • Quality Control: Establish an inspection system and deficiency prevention methods, adhering to specification section 01 45 00.00 10.
  • Environmental: Compliance with bioenvironmental regulations, including HAZCOM, proper disposal of hazardous materials, and testing for asbestos/lead-based paint.
  • Documentation: Extensive submittal requirements, including various plans (Safety, Restoration, SWPPP), schedules, reports, and closeout documents (As-Built Drawings, O&M Manuals).
  • Safety: Adherence to OSHA VPP and EM 385-1-1. Explosion-proof ratings are required for sump pumps and electrical components within the wet well.

Contract Details

  • Contract Type: Implied Firm Fixed-Price (construction).
  • Magnitude: Between $1,000,000 and $5,000,000.
  • Performance Period: Completion within 495 calendar days after Notice to Proceed.
  • Set-Aside: 100% Small Business Set-Aside.
  • NAICS Code: 236220 (Repair Or Alteration Of Waste Treatment And Storage Facilities) with a size standard of $45,000,000.00.
  • Bonds: Performance and Payment Bonds are required.

Submission & Evaluation

  • Proposal Due Date: May 4, 2026, at 1:00 PM CST.
  • Submission: Proposals must be sent to SSgt Isaac Demmers (isaac.demmers@us.af.mil) and CC Tamra Torres (tamra.torres@us.af.mil).
  • Evaluation: Lowest Priced Technically Acceptable (LPTA) procedures, considering technical approach, capability, management, schedule, planning, and price. The government reserves the right to award without discussions.

Important Notes

  • Eligibility: This opportunity is restricted to Tinker AFB MAC BOA holders only. A mandatory initial site visit was held on February 24, 2026, and attendance was required to be eligible to propose.
  • RFI Responses: Clarifications include the intent to combine lift stations, the need for bidders to verify electrical field conditions (as-builts are not accurate), and details on hazardous material handling and explosion-proof requirements.
  • Wage Rates: Prevailing wage rates and fringe benefits apply as per the U.S. Department of Labor's General Decision for Oklahoma County.

People

Points of Contact

Isaac DemmersPRIMARY
Tamra TorresSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: Apr 3, 2026
Version 3
Solicitation
Posted: Mar 27, 2026
View
Version 2
Solicitation
Posted: Feb 24, 2026
View
Version 1
Solicitation
Posted: Feb 17, 2026
View
Tinker AFB MAC BOA - WWYK240176 - REPLACE INDUSTRIAL WASTE LIFT STATIONS 6N & 6S, B62501 | GovScope