TINKER AFB MAC BOA WWYK260003 REPAIR ROOF, ELECT, HVAC & RESTROOMS B#4019
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting proposals for the repair and renovation of Building B4019 at Tinker Air Force Base, Oklahoma. This project, titled "REPAIR ROOF, ELECT, HVAC & RESTROOMS," is exclusively for Total Small Business MAC BOA Holders who attended the mandatory site visit on May 20, 2026. The estimated project value is between $1,000,000 and $5,000,000.00. Proposals are due by June 17, 2026.
Scope of Work
The contractor will furnish all design/engineering services, materials, labor, and equipment necessary for the comprehensive renovation of B4019 for office use. This includes site investigation, logistical, architectural, and structural work. The contractor is responsible for preparing a complete design, with required submissions at 35%, 65%, 95%, and 100% completion stages.
Contract & Timeline
- Contract Type: Firm Fixed Price.
- Set-Aside: Total Small Business (NAICS 236220, Size Standard $45,000,000.00).
- Estimated Magnitude: $1,000,000 - $5,000,000.00.
- Performance Period: Work must begin within 10 calendar days after Notice to Proceed (NTP) and be completed within 265 calendar days.
- Proposals Due: June 17, 2026, at 02:00 PM local time.
- Offers Valid: 120 calendar days after the due date.
- RFIs Due: May 28, 2026.
Eligibility & Requirements
This opportunity is restricted to current MAC BOA Holders who attended the mandatory site visit on May 20, 2026. Key personnel requirements include a Project Manager (10 years experience), Design Project Manager (OK licensed, 10 years experience), Quality Control Manager, Site Safety and Health Officer, and Project Superintendent (5 years experience); resumes are due 5 days after NTP. Performance and Payment Bonds are required. Personnel requiring base access must obtain AFMC Form 387 badges and submit an Entry Access List (EAL). Compliance with Davis-Bacon Act wage rates, OSHA, and environmental regulations is mandatory.
Evaluation
Proposals will be evaluated using a Lowest Priced Technically Acceptable (LPTA) source selection procedure, considering technical acceptability and price.
Additional Notes
Project-specific documents, including the Statement of Work (SOW), Wage Determination, Drawings, and Submittal Register, are attached. For assistance with document access, contact the Contracting Points of Contact.